EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-11-71
ALL ú ú 02 Page 505 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
b) Loosen the two locknuts on the valve rod for the power control unit at the top.
c) Turn the adjustable sleeve until you can easily install rig pin A/S-4.
S 865-012
(7)
Set the FLT CONTROL A and B switches to the ON position.
(a)
Make sure the rig pin A/S-4 can move freely in the two bus drums.
(b)
Make sure the clearances between the lug of the top bus drum and the stop bolts on the bottom bus drum are as specified (Fig. 502). 1) Adjust the valve rods and stop bolts if it is necessary.
S 095-013
(8)
Remove the rig pin A/S-4.
S 865-014
(9)
Turn the aileron control wheel clockwise and counterclockwise from the neutral position.
(a)
Make sure the movement of the aileron is in the specified limit (Fig. 501).
S 435-015
(10)
Tighten the valve rod locknuts.
S 435-016
(11)
Tighten the stop bolt locknuts.
S 435-017
(12)
Install the lockwire.
S 285-018
(13)
Do a check of the autopilot system for the correct roll inputs:
(a)
Put the A/P ENGAGE A switch to CMD.
(b)
Push the HDG SEL button.
(c)
Set the BANK LIMIT switch to 10 and HEADING knob to give an indication of 10 degrees to the right of the airplane heading.
(d)
Make sure the control wheel turns clockwise.
(e)
Do steps (d) again in the left direction.
(f)
Make sure the control wheel turns counterclockwise.
(g)
Disengage the autopilot.
E.
Put the Airplane Back to Its Usual Condition
S 865-001
(1) Do this task to release pressure from hydraulic systems A and B: "Aileron Hydraulic Systems A and B Depressurization" (AMM 27-11-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-11-71
ALL ú ú 01 Page 506 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 865-002
(2) Do this task if electrical power is not necessary: "Electrical Power Removal" (AMM 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-11-71
ALL ú ú 01 Page 507 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
AILERON ARTIFICIAL FEEL, CENTERING AND TRIM MECHANISM -
_____________________________________________________ REMOVAL/INSTALLATION
____________________
1. General_______
A. There are two tasks in this procedure. There is one task for the removal and one task for the installation of the aileron artificial feel, centering and trim mechanism.
TASK 27-11-81-004-001
2. Aileron Artificial Feel, Centering and Trim Mechanism Removal_____________________________________________________________
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 1(151)