• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:21来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

ELEVATOR AUTOPILOT CENTER EAS SEE B
SERVO (EAS) (B7082)
(3 LOCATIONS)

SEE B
SEE A

ACCESS
PANEL
315A FWD
AFT QUADRANT TORQUE TUBE
A
2. 3. NUT WASHER  4. SERVO ASSEMBLY  10. BOLT 
1. BOLT 
1. BOLT 
(REF) CONNECTOR ELECTRICAL  7. 11. NUT WASHER 
5. BOLT  8. ASSEMBLY CONTROL ROD  9.  TORQUE TUBE AFT QUADRANT 
LINE (REF) PRESSURE HYDRAULIC (REF) LINE RETURN HYDRAULIC  ELEVATOR AUTOPILOT SERVO 7. 6. WASHER NUT (REF) OUTPUT CRANK 

Figure 401 Elevator Autopilot Servo Installation 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-12-01
 ALL  ú ú 02 Page 402 ú Feb 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

SEE A
CONTROL COLUMN TORQUE TUBE
RIGGING PIN E-1
FWD
A
Rig Pin Installation Figure 402 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-12-01
 ALL  ú ú 01 Page 403 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

CENTER EAS (B7082)  (B7083) RIGHT EAS LEFT EAS (B7081) 
SEE  B 
FWD 
TORQUE TUBE AFT QUADRANT  AFT QUADRANT TORQUE TUBE 
SEE C 
RIG PIN E-2 
RIG PIN E-2  B 

Figure 402 (Sheet 2) Rig Pin Installation 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-12-01
 ALL  ú ú 01 Page 404 ú Feb 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
 S 864-063
 (3)  Put the FLT CONTROL HYD POWER TAIL 1, 2, and 3 switches in the SHUTOFF position. You can find these switches on the Pilots' Overhead Maintenance Panel (P461).
 S 864-064
 (4)  Put the STAB TRIM 2 and 3 switches in the CUTOUT position. Attach DO-NOT-OPERATE tags to the STAB TRIM 2 and 3 switches. You can find these switches on the Pilots' Control Stand.
 S 864-065
 (5)  Open these circuit breakers and attach DO-NOT-CLOSE tags: (a) P7 Overhead Circuit Breaker Panel 1) 7D7, FLT CONT CMPTR L SERVO 2) 7D8, FLT CONT CMPTR L PWR 3) 7D12, FLT CONT CMPTR C SERVO 4) 7D13, FLT CONT CMPTR C PWR 5) 7D14, FLT CONT CMPTR R SERVO 6) 7D15, FLT CONT CMPTR R PWR 7) 7E7, STAB TRIM L S/O 8) 7E20, STAB TRIM R S/O (b) P180 DC Power Distribution Panel 1) 180E7, ELEV/RUD VLV SYS 2 2) 180E22, ELEV/RUD VLV SYS 4 3) 180H8, ELEV/RUD VLV SYS 1 4) 180H23, ELEV/RUD VLV SYS 3
 S 864-207
 (6)  Attach DO-NOT-OPERATE tags to the two control columns.
 S 014-189
 (7)  Open the ceiling panel in the area below the control columns to get access to the forward quadrant (AMM 25-59-01/401).
 S 834-069
 (8)  Put rig pin E-1 into the forward quadrant (Fig. 402, Sh. 1).
 S 014-070
 (9)  Open access door 315A to get access to the aft quadrant (AMM 06-09-05/201).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-12-01
 ALL  ú ú 06 Page 405 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 484-198
 WARNING:_______DO NOT TOUCH THE PNEUMATIC DUCTS WHEN THEY ARE HOT. WHEN THE DUCTS ARE HOT THEY CAN CAUSE INJURY TO PERSONS.
 (10) Put rig pin E-2 at the bottom of the aft quadrant (Fig. 402, Sh. 2).
 F. Procedure
 S 944-066
 (1)  
Put a bucket below the hydraulic ports.

 S 864-147

 (2)  
Disconnect the hydraulic lines from the EAS and drain the hydraulic fluid into the bucket.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AUTO FLIGHT(90)