• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:21来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 NOTE: The hydraulic system No. 1 supplies the power to the center
____ RPCP. The hydraulic system No. 2 supplies the power to the right RPCP. The hydraulic system No. 3 supplies the power to the left RPCP.
 S 862-035
 (2)  
Set the FLT CONTROL HYD POWER TAIL 1, 2, 3, and 4 switches to the SHUTOFF position. These switches are on the Pilots' Overhead Maintenance Panel, P461.

 S 862-036

 (3)  
Make sure that these circuit breakers are open and DO-NOT-CLOSE tags are attached:

 (a)  
P6, Main Power Distribution Panel
 1) 6J24, RUD/ELEV SENSOR
 2) 6J25, RUD/ELEV IND


 (b)  
P7, Overhead Circuit Breaker Panel
 1) 7D7, FLT CONT CMPTR SERVO L
 2) 7D8, FLT CONT CMPTR PWR L
 3) 7D12, FLT CONT CMPTR SERVO C
 4) 7D13, FLT CONT CMPTR PWR C
 5) 7D14, FLT CONT CMPTR SERVO R
 6) 7D15, FLT CONT CMPTR PWR R

 

 

 S 012-037
 (4)  Make sure that you remove the access panels 324EL, 324FL, and 324FR (optional)(AMM 06-09-07/201).
 F.  RPCP Electrohydraulic Servovalve and Solenoid Valve Installation
 S 432-038
 CAUTION: DO NOT LET HYDRAULIC FLUID GET INTO THE ELECTRICAL CONNECTOR.
_______ THE HYDRAULIC FLUID CAN CAUSE DAMAGE AND FAILURE TO THE ELECTRICAL CONNECTOR.
 (1)  
Remove the covers from the hydraulic ports on the RPCP.

 S 162-039

 (2)  
Clean the surfaces of the valve gasket plate and the RPCP with the clean hydraulic fluid.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-13-05
 ALL  ú ú 03 Page 205 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 432-040
 (3)  
Remove the cover from the electrical port.

 S 642-041

 (4)  
Lightly lubricate the new gasket plate and the O-ring with the MCS352 lubricant.

 S 432-042

 (5)  
Install the new O-ring with the O-ring installation tool (AMM 20-11-19/401).

 S 642-043

 (6)  
Lightly lubricate the mounting screws with the MIL G-23827 grease.

 S 422-061

 (7)  
Install the valve and gasket plate on the RPCP with the mounting screws and washers.


 (a)  Tighten the mounting screws from 70 to 80 pound-inches.
 S 762-045
 (8)  
Use the bonding meter to make sure that the resistance between the valve and RPCP is 5.0 milliohms (0.005 ohm) or less (AMM 20-22-01/601).

 S 432-046

 (9)
Install the lockwire on the mounting screws (AMM 20-11-28/401).


 TASK 22-13-05-702-065
 4. Electrohydraulic Servovalve and Solenoid Valve Test
___________________________________________________
 A. References
 (1)  
AMM 06-09-07/201, Fin and Rudder Access Doors and Panels

 (2)  
AMM 21-58-00/501, Electrical/Electronic Equipment Cooling System

 (3)  
AMM 22-10-00/501, Autopilot/Flight Director System

 (4)  
AMM 24-22-00/201, Manual Control

 (5)  
AMM 29-11-00/201, Main Hydrualic Supply System

 (6)  
AMM 34-21-00/501, Inertial Reference System


 B. Access
 (1)  Location Zones
 121 Control Cabin - LH
 122 Control Cabin - RH

 C. Prepare for the RPCP Electrohydraulic Servovalve and Solenoid Valve Test
 S 862-056
 (1)  Supply electrical power (AMM 24-22-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-13-05
 ALL  ú ú 03 Page 206 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 862-057
 (2) Remove the DO-NOT-CLOSE tags and close these circuit breakers:
 (a)  
P6, Main Power Distribution Panel
 1) 6H24, RUD/ELEV SENSOR
 2) 6H25, RUD/ELEV IND


 (b)  
P7, Overhead Circuit Breaker Panel
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AUTO FLIGHT(134)