• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:21来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Disconnect the hydraulic lines from the RPCP.

 S 032-013

 (3)  
Drain the hydraulic fluid into the bucket.

 S 032-014

 (4)  
Install the covers on the hydraulic lines and hydraulic ports on the RPCP.


 S 162-015
 CAUTION:_______DO NOT LET THE CONTAMINATION GET INTO THE RPCP. THE RPCP IS A SENSITIVE DEVICE. THE CONTAMINATION CAN CAUSE DAMAGE AND FAILURE TO THE RPCP.
 (5)  
Fully clean the area around the RPCP and the RPCP mounting surfaces with a clean rag.

 S 032-016

 (6)  
Disconnect the electrical connector from the RPCP.

 S 032-017

 (7)  
Install the covers on the electrical input to the RPCP and on the end of the electrical connector.

 S 032-018

 (8)  
Disconnect the bonding jumper from the RPCP.


 NOTE: The other end of the bonding jumper is attached to the
____
 structure.

 S 032-019
 (9)  
Move the hydraulic lines, electrical wires, and bonding jumper away from the RPCP.

 S 032-020

 (10)
 Remove and keep the bonded-bolt assembly, large nut, small nut, and washers which attach the RPCP output arm to the control rod assembly.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-13-04
 ALL  ú ú 01 Page 205 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 022-021
 (11)
 Hold the RPCP and remove the mounting bolts and washers.

 S 022-022

 (12)
 Remove the RPCP from the mounting surfaces.


 TASK 22-13-04-402-023
 3.  Rollout Power Control Package Installation (Fig. 201)__________________________________________
 A. Standard Tools and Equipment
 (1)  Bonding Meter - Autron T477W
 B. Consumable Materials
 (1)  A00247 Sealant - Chromate type BMS 5-95, class B-2
 C. References
 (1)  
AMM 06-09-07/201, Fin and Rudder Access Doors and Panels

 (2)  
AMM 29-11-00/201, Main Hydraulic Supply System


 D. Access
 (1)  
Location Zone 324 Vertical Stabilizer Between Rear Spar and Trailing Edge

 (2)  
Access Panels 324EL Left Side Vertical Stabilizer Midway Down Lower Rudder 324FR Right Side Vertical Stabilizer Between Upper and Lower


 Rudder 324FL Left Side Vertical Stabilizer Between Upper and Lower Rudder
 E. Prepare for the Rollout Power Control Package Installation
 S 862-024
 (1)  Make sure that these circuit breakers are open and DO-NOT-CLOSE tags are attached:
 (a)  
P6, Main Power Distribution Panel
 1) 6J24, RUD/ELEV SENSOR
 2) 6J25, RUD/ELEV IND


 (b)  
P7, Overhead Circuit Breaker Panel
 1) 7D7, FLT CONT CMPTR SERVO L
 2) 7D8, FLT CONT CMPTR PWR L
 3) 7D12, FLT CONT CMPTR SERVO C
 4) 7D13, FLT CONT CMPTR PWR C
 5) 7D14, FLT CONT CMPTR SERVO R
 6) 7D15, FLT CONT CMPTR PRW R

 

 S 012-025
 (2)  Make sure that you remove the access panels 324EL, 324FL, and 324FR (optional) (AMM 06-09-07/201).
 F. Rollout Power Control Package Installation
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-13-04
 ALL  ú ú 01 Page 206 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 162-026
 CAUTION:_______DO NOT LET CONTAMINATION GET INTO THE RPCP. THE RPCP IS A SENSITIVE DEVICE. THE CONTAMINATION CAN CAUSE DAMAGE AND FAILURE TO THE RPCP.
 (1)  
Fully clean the RPCP mounting surfaces and the support mating surfaces with a clean rag.

 S 422-027

 (2)  
Hold the RPCP in its position and install the mounting bolts and washers.


 (a)  Tighten the mounting bolts to 50-70 pound-inches.
 S 422-089
 (3)  Connect the RPCP output arm to the control rod assembly with the bonded-bolt assembly, washer, and nuts.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AUTO FLIGHT(124)