• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-31 23:57来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A
737-300/400/500MAINTENANCE MANUAL
 S 033-086
 (5)  Slowly loosen the cap from the oxygen cylinder.
 S 873-082
 (6)  Bleed off the remaining gas before you fully remove the cap.
 NOTE:____ Pressure caps are used on oxygen cylinders that have
 metal seats in the shutoff valves.  The cap is usually
 attached to the cylinder with a chain.  Do not cut or remove
 the chain after you remove the cap.

 S 033-087
 (7)  
Remove the cap. S 423-024

 (8)  
Put the fully serviced cylinder in its mounting position. NOTE: Make sure that the high pressure outlet aligns with


____ the high pressure line connection.
 S 433-025 WARNING: DO NOT USE LUBRICANT, OIL OR GASKETS ON THESE CONNECTIONS.
_______ WHEN CONTAMINATION IS OPEN TO OXYGEN, A FIRE OR EXPLOSION CAN OCCUR. INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR.
 (9)  
Connect the high pressure oxygen line. S 433-026

 (10)
 Tighten the T-bolt nut to the applicable torque value (AMM 20-50-11/201).


 NOTE: Make sure the T-bolt holds the oxygen cylinder tightly to
____ prevent all unwanted movements.
 (a)  Make sure the threads of the T-bolt extends through the nut with at least the chamfer visible.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 12-15-21
 ALL  ú ú 01 Page 308 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 433-027
 (11)
 Connect the overboard discharge line and make sure the connection is tight.

 S 423-028

 (12)
 Put the cylinder assembly in its position.

 S 433-077

 (13)
 Attach the cylinder assembly with a clamp.

 S 863-029

 (14)
 To open the shutoff valves on the oxygen cylinders, do the steps that follow:

 (a)  
Open the shutoff valve on the crew oxygen cylinder slowly and fully.

 (b)  
Do not tighten the valve more than 25 inch-pounds (Hand tighten).

 (c)  
Close the valve one-fourth of a turn.

 (d)  
When you put the system back to its initial condition, you must use lockwire to keep the valve in this position.

 


 WARNING:_______ YOU MUST OPEN THE VALVES SLOWLY OR HIGH TEMPERATURES CAN
 OCCUR.  AS A RESULT OF HIGH OXYGEN TEMPERATURES, A FIRE OR
 EXPLOSION CAN OCCUR, AND THIS CAN CAUSE INJURY TO PERSONS AND
 CAUSE DAMAGE TO THE EQUIPMENT.
 CAUTION:_______ YOU MUST NOT TIGHTEN THE VALVE MORE THAN THE GIVEN TORQUE.
 DAMAGE TO THE VALVE CAN OCCUR.

 NOTE: Use the 0.020 inch diameter copper lockwire (AMM
____ 20-10-44/401).
 S 793-030
 (15) Do a leakage check of the cylinder connections with the leak detection compound refer to AMM 20-30-51/201.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 12-15-21
 ALL  ú ú 01 Page 309 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 163-031
 (16)
 Rub the leak test solution off with a lint free cloth immediately after the leak test.

 S 863-032

 (17)
 Make sure that the system pressure is in the necessary range.

 S 553-033

 (18)
 If oxygen cylinders have pressure caps attached to the cylinders by chains, use lockwire to decrease the caps movement.


 I. Put the Airplane Back to Its Usual Condition
 S 413-034
 (1) Close the access to the oxygen cylinder.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 12-15-21
 ALL  ú ú 01 Page 310 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 SERVICING(63)