• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-15 08:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A
747-400
MAINTENANCE MANUAL

 C. Access
 (1)  
Location Zone 122 Forward Cargo Container Compartment Forward Half, RH 142 Aft Cargo Container Compartment, RH

 (2)  
Access Panel
 821R Door - Forward Cargo Compartment
 822R Door - Aft Cargo Compartment


 D.
Procedure


 S 864-081
 (1)  
Open the cargo door to get access to the switches.

 S 424-062

 (2)  
Install the door warning switch on the pressure relief door (Fig. 403).

 (a)  
Remove one locknut and put the second locknut against the switch body.

 (b)  
Install the switch in the bracket.

 (c)  
Install the keywasher and the locknut.

 (d)  
Tighten the locknut and install a lockwire.

 (e)  
Connect the wiring to the switch at the connector.

 (f)  
Adjust the door warning switch. 1) Make sure the master latch lock handle is closed. 2) Measure the continuity between pins 2 on the P3 connector


 and ground on the cargo door junction box. 3) Turn the bolt on the switch until there is no continuity between pins 2 and ground on the P3 connector. 4) Turn the bolt 5 +/- 1/8 turn more.
 S 414-140
 (3)  
Install the door latched switch.

 (a)  
Put the switch in the hole in the door beam.

 (b)  
Put the locknut on the switch.

 (c)  
Put the lockwire on the switch.

 (d)  
Connect the wiring to the switch.

 (e)  
Adjust the door latched switch. 1) Use a torque wrench to turn the latch actuator clockwise. 2) Monitor the torque you use to turn the latch actuator. 3) Turn the actuator until the torque increases 15 to 20


 pound-inches.
 NOTE: This is where the actuator hits the internal stops.
____
 4) Turn the latch actuator twelve turns counterclockwise.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-71-01
 ALL  ú ú 11 Page 425 ú Feb 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 5) Disconnect the P3 connector from the cargo door junction
 box.
 6) Turn the screw to make the switch operate.
 7) Make sure the door latched switch does not ground pin 18 of
 the P3 connector when the switch operates.
 8) Connect the P3 connector to the cargo door junction box.
 S 424-141
 (4)  
Install the door closed switch.

 (a)  
Put the switch in the bracket.

 (b)  
Put the locknut on the switch.

 (c)  
Put the lockwire on the switch.

 (d)  
Connect the wiring to the switch.

 (e)  
Adjust the door closed switch. 1) Turn the screw on the switch clockwise until it will not move. 2) Turn the screw on the switch 3.0 +/- 1/8 turns counterclockwise. 3) Disconnect the P3 connector from the cargo door junction box. 4) Make sure there is continuity between pin 16 on the P3


 connector and ground. 5) Connect the P3 connector to the cargo door junction box.
 S 864-039
 (5)  
Close these circuit breakers for the applicable EICAS system:

 (a)  
P7 Overhead Circuit Breaker Panel
 1) 7F8 UPR EICAS
 2) 7F9 EIU L
 3) 7F10 EIU C
 4) 7F14 LWR EICAS
 5) 7F15 EIU R


 (6)  
Supply the electrical power (AMM 24-22-00/201).

 S 724-041

 (7)  
Do a test of the door warning system on the applicable cargo door.

 (a)
Make sure the applicable cargo door is closed and locked.


 S 864-040
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-71-01
 ALL  ú ú 06 Page 426 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 (b)

(c)

(d)

(e)


A
747-400 MAINTENANCE MANUAL
Do a test of the green LATCHES CLOSED light.
 1) See that the green LATCHES CLOSED light on the door control
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 4(88)