• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-15 08:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 424-020

 (3)  
Tighten the nut one-half turn more.

 S 024-008

 (4)  
Put the door in the center postion and attach the hinge to the door with eight washers, four bolts, and nuts.

 S 824-022

 (5)  
Install shims until you get the correct flushness
 (Ref 52-36-01/401).


 S 434-009

 (6)  
On the forward hinge, attach the snubber to the forward hinge with three bolts, washers, and nuts.


 S 434-010
 WARNING: DO NOT REMOVE THE SAFETY PIN OR RESTRAINING TOOL, WHICH HOLDS
_______ THE CABLE IN THE SPRING TUBE, UNTIL THE CABLE IS CONNECTED TO THE DOOR. THE CABLE HAS HIGH TENSION AND WILL QUICKLY RETRACT INTO ITS HOUSING AND CAUSE INJURY IF YOU REMOVE THE SAFETY PIN OR RESTRAINING TOOL.
 (7)  
Connect the balance mechanism cable to the door (Ref 52-36-02/401).

 S 094-011

 (8)  
Close the door to release the tension on the safety pin or
 restraining tool.

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-36-04
 ALL  ú ú 01 Page 404 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 094-021
 (9)
Remove the safety pin or restraining tool.

 S 414-012

 (10)
 Install the ceiling lining (Ref 25-55-02/401).

 S 414-013

 (11)
 Install the insulation retaining studs that are adjacent to the hinges.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-36-04
 ALL  ú ú 01 Page 405 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 BULK CARGO DOOR SNUBBER - REMOVAL/INSTALLATION
______________________________________________
 1.  General_______
 A. This procedure contains two tasks:
 (1)  
The removal of the snubber from the bulk cargo door.

 (2)  
The installation of the snubber on the bulk cargo door.


 TASK 52-36-05-004-004
 2.  Snubber - Removal_________________
 A. References
 (1)  
IPC 52-36-04 Fig. 1

 B.
Access

 (1)  
Location Zone
 146 Bulk Cargo Compartment, RH


 (2)  
Access Panel
 823R Door - Bulk Cargo Compartment


 C.
Procedure


 S 864-001
 (1)  
Close and latch the bulk cargo door.

 S 024-002

 (2)  
Remove the snubber as follows (Fig. 401):

 (a)  
Disconnect the lower end of the snubber from the mounting bracket on the door hinge.

 (b)  
Disconnect the top end of the snubber from the mounting bracket on the fuselage frame.

 (c)  
Remove the snubber from the airplane.


 NOTE: Do not open the door until the snubber is installed.
____
 TASK 52-36-05-404-005
 3.  Snubber - Installation______________________
 A. Consumable Material
 (1)  
D00013 Grease - MIL-G-23827

 B.
References

 (1)  
IPC 52-36-04 Fig. 1

 C.
Access

 (1)  
Location Zone
 146 Bulk Cargo Compartment, RH

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-36-05
 ALL  ú ú 01 Page 401 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
MOUNTINGBRACKET
NUT SNUBBER
SEE A WASHERBOLT
FWD 
NUT BRACKET MOUNTING  BOLT WASHER 
A SNUBBER 
Figure 401 Bulk Cargo Door Snubber Installation 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 4(23)