• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-15 08:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (e)  
Loosen the three bolts that hold the latch keeper to the structure.

 (f)  
Close and latch the door.


 S 824-019
 (3)  
Adjust the door stops.

 (a)  
Remove the lock wire.

 (b)  
Move the door stops to align the door with the fuselage.


 1)  The door must be from 0.03 to 0.09 inch inboard from the outer contour of the fuselage.
 NOTE: This dimension is for an airplane that is not
____
 pressurized.

 (c)  
Move the door to see that it hits the four door stops at the same time.

 (d)  
Install the lockwire.

 (e)  
Tighten the bolts that hold the hinge arms to the door.


 1)  Make sure that the door does not move from the door stops when you tighten these bolts.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-48-04
 ALL  ú ú 01 Page 404 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 2)  Change the serrations below the hinge arm if the door moves from the door stops.
 (f)  Tighten the bolts that hold the latch keeper to the structure. 1) Make sure the door does not move from the door stops when you tighten these bolts.
 2)  Change the serrations below the latch keeper if the door moves from the door stops.
 S 824-020
 (4)  
Adjust the door hinge arms.

 (a)  
Make sure the door is in the center of the opening.

 (b)  
Change the number of washers on the hinge bolts if it is necessary.


 NOTE: This will move the door forward or aft in
____
 the opening.

 (c)  
Tighten the nuts on the hinge bolts to 5 pound-inches.

 (d)  
Install cotter pins on the nuts.


 S 724-022
 (5)  
Do a check of the operation of the latch pin.

 (a)  
Move the handle to operate the latch mechanism.

 (b)  
Make sure the latch pin moves freely and easily into the latch keeper.

 (c)  
Change the serrations below the latch keeper or the hinge arms if it is necessary.


 NOTE: This moves the latch or the door to make the latch
____
 pin moves freely and easily.

 S 224-024
 (6)  
If you install a new door, do a check of the clearance around the door.

 (a)  
Measure 0.03 to 0.09 inch between the edges of the door and the fuselage.

 (b)  
Remove material from the edge of the door if it is necessary to get this clearance.

 (c)  
When you remove material, paint the areas with Alodine (Ref 51-21-04/701).


 S 434-012
 (7)  
Install the bonding jumper.

 (a)  
Clean the areas of the door that touch the bonding jumper.

 (b)  
Connect the bonding jumpers to the door.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-48-04
 ALL  ú ú 01 Page 405 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 724-023
 (8)
Open and close the door to make sure it operates correctly.

 S 864-014

 (9)
Supply electrical power (Ref 24-22-00/201).

 S 714-015

 (10)
 Do a test of the door warning switch.

 (a)
Open the door.

 (b)
See that DOOR ELEC CTR shows on the EICAS display.

 (c)
Close the door.

 (d)
See that DOOR ELEC CTR does not show on the EICAS display.


 S 864-016
 (11) Remove electrical power if it is not necessary (Ref 24-22-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-48-04
 ALL  ú ú 01 Page 406 ú Feb 10/91
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 4(44)