(d)
Make sure you can push the latch bolt up 0.01 to 0.03 inch.
1) Change the shim below the face of the latch if it is necessary to get this dimension.
S 434-021
(8)
On doors with a hold-open rod, install the hold-open rod.
(a)
Connect the hold-open rod to the bracket on the door. 1) Use your fingers to tighten the nut on the bolt. 2) Put a cotter pin through the bolt to hold the nut.
(b)
If the bracket that attaches the hold-open rod to the structure has a slot, adjust the hold-open rod. 1) Open the adjacent door to get access to the top of the
hold-open rod.
2) Do a check of the clearance between the joint in the hold-open rod and the air-conditioning duct. a) Close the door. b) Make sure the clearance is approximately 1.0 inch. c) Move the bracket that attaches the hold-open rod to the
structure to get this dimension. d) See that there is 0.02 inch between the hold-open rod and the latch (Section B-B). e) Tighten the bolts in the bracket. 3) Close the adjacent door.
S 434-022
(9)
Install the bonding jumpers (Section C-C).
(10)
Install the covers between the hinges.
S 764-023
(11)
Make sure the antenna will receive correctly.
(a)
Measure the resistance between the flame-sprayed surface of the door and the adjacent structure (Ref 20-22-01/601). 1) See that the resistance is less than 0.01 ohms.
(b)
Measure the resistance between the quick-release fasteners and the flame-sprayed surface of the door (Ref 20-22-01/601). 1) Make sure the resistance is less than 0.5 ohms.
S 414-011
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-48-01
ALL ú ú 01 Page 407 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
(c)
Clean the quick-release fasteners if it is necessary to get the correct resistance (Ref 51-24-03/701).
(d)
Do a check of the resistance again if you cleaned the quick release fasteners.
S 724-025
(12) Open and close the door to make sure it operates correctly.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-48-01
ALL ú ú 01 Page 408 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
AIR CONDITIONING ACCESS DOORS - INSPECTION/CHECK
________________________________________________
1. General_______
A. This procedure contains a task that examines the air conditioning access door latches and hinges.
TASK 52-48-01-206-001
2. Air Conditioning Access Doors Inspection (Fig. 601)________________________________________
A. References
(1)
52-48-01/401, Air Conditioning Access Door
(2)
IPC 52-48-01
B.
Access
(1)
Location Zone
133 Air Conditioning Equipment Bay Left
134 Air Conditioning Equipmnet Bay Right
(2)
Access Panel
191AL Door - Air Conditioning Access
191EL Panel - Air Conditioning Access
191HL Door - Air Conditioning Access
191JL Panel - Pressure Relief
191ML Panel - Air Conditioning Access
191NL Door - Air Conditioning Access
192AR Door - Air Conditioning Access
192ER Panel - Air Conditioning Access
192HR Door - Air Conditioning Access
192JR Panel - Pressure Relief
192MR Panel - Air Conditioning Access
C.
Procedure
(1)
Remove the air conditioning access door (Ref 52-48-01/401).
S 226-003
(2)
Measure the fits of the fittings, bushings, bolts, hinge assemblies, screws, latches and shims.
(3)
Install the air conditioning access door (Ref 52-48-01/401).
S 026-002
S 426-004
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú