S 422-009
(5)
Install a view port window as follows:
(a)
Apply sealant around the circumference of the view port window (Views E and B-B).
(b)
Apply sealant in the countersunk area of the fastener or hole.
(c)
Install the view port window and retainer.
(d)
Install the fasteners, washers, nuts.
(e)
Make sure that you can see the latch alignment stripe and arrow through the view port windows.
S 862-010
(6)
Remove the DO-NOT-CLOSE tags and close these circuit breakers for the applicable cargo door:
(a)
P59 Aft Equipment Panel
1) AFT CARGO DOOR POWER UNITS
(b)
P414 Power Distribution Center - Left 1) 414A21 LOWER CARGO DOOR FWD 2) 414F15 CARGO DOOR CONTROL FWD 3) 414F16 CARGO DOOR CONTROL AFT
S 862-011
(7) Close the cargo door electrically to the fully closed position.
TASK 52-34-21-202-046
6. Inspect the Forward/Aft Cargo Door Alignment Marks (Fig. 202)__________________________________________________
A. General
(1)
This is a scheduled maintenance task.
(2)
The latch alignment marks consist of a stripe on the latch cam and an arrow on the latch fitting.
(3)
This inspection should be conducted at each of the eight viewing ports on the cargo door.
B.
Access
(1)
Location Zone
122 Forward Cargo Container Compartment
142 Aft Cargo Container Compartment
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-34-21
ALL ú ú 03 Page 214 ú Jun 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
C. Procedure
S 222-047
(1)
With the cargo door in the fully closed, latched, and locked position, perform a visual inspection of the latch alignment marks as follows:
(a)
Inspect the latch alignment marks through the door viewing ports to make sure that stripe and arrow at each of the viewing ports are aligned.
NOTE: Arrow point may be misaligned up to 0.1 inch on either
____
side of stripe centerline.
(b)
Make sure the alignment marks are not missing or damaged to a degree to where positive visual indication of a fully latched cargo door cannot be obtained.
(c)
Replace alignment marks as necessary so that positive visual indication can be achieved.
(d)
Make sure the view ports in the cargo door remain clean to allow for good visibility of the alignment marks.
(e)
Clean or replace viewing ports as necessary.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-34-21
ALL ú ú 01 Page 215 ú Jun 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
ALIGNMENT MARKS
SEE A
FWD FORWARD/AFT CARGO DOOR (EXAMPLE)
ALIGNMENT STRIPE
ARROW
ALIGNMENT MARKS
(VIEW THROUGH THE VIEW PORT WINDOW)
(8 LOCATIONS)
A
Alignment Marks Inspection Figure 202
F03643
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-34-21
ALL ú ú 02 Page 216 ú Jun 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
CARGO DOOR PULL-IN HOOK - REMOVAL/INSTALLATION
______________________________________________
1. General
_______
A. This procedure contains four tasks:
(1)
The first task is the removal of the cargo door pull-in hook.
(2)
The second task is the installation of the cargo door pull-in hook.
(3) 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 4(2)