(a)
Main Power Distribution Panel, P6
1) 6H20 L ISO VLV AIR SUPPLY PWR
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-07
ALL ú ú 01 Page 201 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
BSEE VALVE ISOLATION LEFT WING
SEE A
FWD VALVE ISOLATION RIGHT WING BSEE
A
MANUAL DRIVE
ELECTRICAL CONNECTOR
INDICATOR POSITION HOUSING ACTUATOR
____NOTE: RIGHT WING ISOLATION VALVE SIMILAR. LEFT WING ISOLATION VALVE SHOWN. B
Figure 201 Wing Isolation Valve Deactivation
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-07
ALL ú ú 01 Page 202 ú Jun 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
2) 6H24 R ISO VLV AIR SUPPLY PWR
S 042-006
(3)
Examine the position indicator on the actuator housing.
(a)
If the position indicator is not in the OPEN position, turn the manual drive until it is in the OPEN position.
S 042-007
(4)
Disconnect the electrical connector from the isolation valve:
(a)
DV108 VALVE - WING ISOLATION L
(b)
DV109 VALVE - WING ISOLATION R
S 042-008
(5)
Put caps on the open end of the electrical connector.
(a)
Put the electrical connector in a safe position.
S 862-023
(6)
Put the receptacle on the actuator.
S 862-009
(7)
Remove electrical power if it is not necessary (Ref 24-22-00/201).
S 412-010
(8)
Close the applicable access door (AMM 06-09-03/201).
TASK 36-11-07-442-011
3. Activate the Wing Isolation Valve (Fig. 201)
_________________________________
A. References
(1)
AMM 06-09-03/201, Body Section 44 Access Doors and Panels
(2)
24-22-00/201, Manual Control
B.
Access
(1)
Location Zone 191 Fairing, Wing To Body, Forward Lower Half, LH 192 Fairing, Wing To Body, Forward Lower Half, RH
(2)
Access Panel
191NL Air-Conditioning Access Door
192NR Air-Conditioning Access Door
C.
Prepare to Activate the Wing Isolation Valve
(1)
Supply electrical power (Ref 24-22-00/201).
S 012-013
(2)
Open the applicable access door (AMM 06-09-03/201):
(a)
191NL for the left isolation valve
(b)
192NR for the right isolation valve
S 862-012
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-07
ALL ú ú 01 Page 203 ú Oct 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(3) S 862-014Make sure the applicable circuit breaker is open: (a) Main Power Distribution Panel, P6 1) 6H20 L ISO VLV AIR SUPPLY PWR 2) 6H24 R ISO VLV AIR SUPPLY PWR
(4) S 862-015Make sure the wing ISLN switch, on the P5 Overhead Panel, is in the OPEN position.
(5) S 032-022Remove the caps from the electrical connector.
(6) S 012-021Remove the receptacle from the valve actuator.
(7) S 432-017Connect the electrical connector to the isolation valve: (a) DV108 VALVE - WING ISOLATION L (b) DV109 VALVE - WING ISOLATION R
(8) S 862-018Remove the DO-NOT-CLOSE tag and close the applicable circuit breaker: (a) Main Power Distribution Panel, P6 1) 6H20 L ISO VLV AIR SUPPLY PWR 2) 6H24 R ISO VLV AIR SUPPLY PWR
(9) S 862-019Remove electrical power if it is not necessary (Ref 24-22-00/201).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 气动系统 PNEUMATIC SYSTEM(97)