747-400 MAINTENANCE MANUAL
BLEED AIR CONTROL MODULE - REMOVAL/INSTALLATION
_______________________________________________
1. General_______
A. This procedure contains two tasks. The first task removes the bleed air control module. The second task installs the bleed air control module and performs a post installation test of the bleed air control module.
B. The bleed air control module is found at the pilot's overhead panel, P5 in the control cabin.
TASK 36-11-29-004-001
2. Remove the Bleed Air Control Module (Fig. 401)___________________________________
A. References
(1)
IPC 36-21-00 Fig. 5
B.
Access
(1)
Location Zone
222 Control Cabin, R.H
C.
Prepare to Remove the Bleed Air Control Module
S 864-002
(1)
Open the applicable circuit breaker that follows and attach a DO-NOT-CLOSE tag:
(a)
On the P6 main power distribution panel 1) 6H32, AIR SUPPLY CONT ENG 1 2) 6H33, AIR SUPPLY CONT ENG 2 3) 6H34, AIR SUPPLY CONT ENG 3 4) 6H35, AIR SUPPLY CONT ENG 4 5) 180J1, PACK 1 FLOW CONT VLV 6) 180J2, PACK 1 PROT 7) 180F1, PACK 2 FLOW CONT VLV 8) 180F2, PACK 2 PROT 9) 180J16, PACK 3 FLOW CONT VLV 10) 180J17, PACK 3 PROT
D.
Remove the Bleed Air Control Module
S 024-003
(1)
Loosen the quarter-turn fasteners (4 locations) and move the module until you get access to the electrical connectors.
(2)
Pull the bleed air control module from the P5 overhead panel.
S 934-015
(3)
Put a label on the electrical connectors on the back of the panel to make them easily identifiable for installation.
S 024-014
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-29
ALL ú ú 06 Page 401 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
BLEED CONTROL
FLIGHT COMPARTMENT
QUARTER-TURN FASTENER (4 LOCATIONS)
BLEED CONTROL MODULE, M7328
Bleed Air Control Module - Removal/Installation
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-29
ALL ú ú 01 Page 402 ú Jun 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
F02233
A
747-400
MAINTENANCE MANUAL
S 024-011
(4) Disconnect the electrical connectors from the back of the bleed air control module.
TASK 36-11-29-404-004
3. Install the Bleed Air Control Module (Fig. 401)
____________________________________
A. References
(1)
AMM 24-22-00/201, Manual Control
(2)
AMM 49-11-00/201, Auxiliary Power Unit
(3)
IPC 36-11-29, Fig. 5
B.
Access
(1)
Location Zone
222 Control Cabin, R.H.
133 Air Conditioning Equipment Bay, Left
134 Air Conditioning Equipment Bay, Right
C.
Install the Bleed Air Control Module
S 424-005
(1)
Connect the applicable electrical connectors to the back of the bleed air control module.
S 424-011
(2)
Put the bleed air control module in position onto the pilot's overhead panel, P5 and then tighten the quarter-turn fasteners (4 locations).
S 424-009
(3)
Turn each quarter-turn fasteners (4 locations) to secure the module to the P5 panel.
D.
Post Installation Test of the Bleed Air Control Module