• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-13 08:10来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)  
AMM 36-00-00/201, Pneumatic System


 C. Access
 (1)  
Location Zone 315/316 Area Aft of Stabilizer Box Compartment

 (2)  
Access Panel
 315AL Door - Access

 

 D. Procedure
 S 864-186
 (1)
Release the pressure in the pneumatic system (AMM 36-00-00/201).

 S 014-187

 (2)  
Open the 315AL access door in the area aft of the stabilizer box compartment.

 S 214-188

 (3)  
Get access to the APU pneumatic duct restraint.

 S 034-171

 (4)  
Remove the nut from the T-bolt.

 S 034-172

 (5)  
Remove both bolts (along with washers, nuts, and radius fillers) between the duct restraint strap and the two restraint cables.

 S 034-173

 (6)  
Remove the duct restraint clamp.

 S 034-174

 (7)  
Remove the duct restraint strap.


 TASK 36-11-01-004-194
 15. Install the APU Duct Restraint (Fig. 406)
______________________________
 A. General
 (1)  This procedure contains one task. The procedure gives instructions to attach the APU duct restraint cable to the pneumatic duct.
 B. References
 (1)  
AMM 06-09-05/201, Body Section 48 Access Doors and Panels

 (2)  
AMM 36-00-00/201, Pneumatic System


 C. Access
 (1)  
Location Zone 315/316 Area Aft of Stabilizer Box Compartment

 (2)  
Access Panel
 315AL Door - Access

 

 D. Procedure
 S 864-189
 (1) Release the pressure in the pneumatic system (AMM 36-00-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-11-01
 ALL  ú ú 04 Page 432 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (2)  S 014-190Open the 315AL access door in the area aft of the stabilizer box compartment.
 (3)  S 214-191Get access to the APU pneumatic duct restraint.
 (4)  S 434-175Put the duct restraint strap around the duct.
 (5)  S 434-176Put the duct restraint clamp around the duct.
 (6)  S 824-177Align the two restraint cables with the duct restraint strap in order to install the bolts.
 (7)  S 434-178Install both bolts (along with washers, nuts, and radius fillers) between the duct restraint strap and the two restraint cables (do not tighten).
 (8)  S 434-179Install the T-bolt (do not tighten).
 (9)  S 434-180Tighten the two nuts and bolts between the duct restraint strap and the restraint cables.
 S 824-181

 CAUTION: MAKE SURE THAT THE UPPER RESTRAINT CABLE DOES NOT TOUCH THE
_______ DUCT.
 (10) Push the duct restraint clamp and strap downward to make sure that the upper cable has approximately 1/2-inch deflection.
 S 434-183 CAUTION: WHEN THE T-BOLT IS TIGHTENED, DO NOT FLAT-SPOT OR CRUSH THE
_______ DUCT.
 (11)
 Tighten the T-bolt to a maximum of 20 inch-pounds. S 824-184

 (12)
 If installed, adjust the turnbuckle so that both cables have the same tension.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-11-01
 ALL  ú ú 03 Page 433 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 E.  Put the airplane back to its usual condition. S 414-185
 (1) Close the 315AL access door.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-11-01
 ALL  ú ú 03 Page 434 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 PNEUMATIC DUCT - INSPECTION/CHECK
_________________________________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 气动系统 PNEUMATIC SYSTEM(67)