• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-11 09:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 3) 180H4, PUMP CONT BST 2 AFT 3 FWD
 4) 180H17, FUEL SYS EICAS INTFC CONT
 5) 180H19, PUMP CONT BST 2 FWD 3 AFT


 (c)  
On the left power distribution center panel, P414:
 1) 414A8, MAIN FWD BST PUMP 4
 2) 414B5, MAIN AFT BST PUMP 1
 3) 414E24, MN-AFT PUMP CONT BOOST 2
 4) 414J5, MAIN FWD BST PUMP 3
 5) 414R18, MAIN AFT BST PMP 2


 (d)  
On the right power distribution center panel, P415:
 1) 415A35, MAIN AFT BOOST PUMP 4
 2) 415B35, MAIN FWD BOOST PUMP 1
 3) 415G29, MAIN FWD BOOST PUMP 2
 4) 415M29, MAIN AFT BOOST PUMP 3

 

 S 015-318
 (8)  
Do these steps at the applicable engine where the maintenance is to be done.

 (a)  
Remove the electrical power (AMM 24-11-00/201).

 (b)  
Open the fan cowl panels (AMM 71-11-04/201).


 WARNING: DO THE THRUST REVERSER DEACTIVATION PROCEDURE TO PREVENT
_______ THE OPERATION OF THE THRUST REVERSER. THE ACCIDENTAL OPERATION OF THE THRUST REVERSER CAN CAUSE INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT.
 (c)  Do this procedure: Thrust Reverser Deactivation for Ground Maintenance (AMM 78-31-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-22-00
 ALL  ú ú 13 Page 541 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (d)  Open the core cowl panels (AMM 71-11-06/201).
 WARNING: OBEY THE INSTRUCTIONS IN AMM 78-31-00/201 WHEN YOU OPEN
_______ THE THRUST REVERSERS. IF YOU DO NOT OBEY THE INSTRUCTIONS, INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR.
 (e)  Open the thrust reversers (AMM 78-31-00/201).
 S 655-292
 (9)  
Do these steps to drain the fuel from the applicable fuel line and engine fuel pump.

 (a)  
Put the fuel resistant container (5 gallon), below the applicable engine fuel pump.

 (b)  
Remove the drain plug from the fuel pump.

 (c)  
Drain the fuel into the container.

 (d)  
Remove and discard the O-ring from the drain plug.

 H.
Test the Spar Valve for the No. 1 Engine


 NOTE: This test makes sure that the spar valve is in the correct
____
 closed position.

 S 865-361
 (1)
Make sure the FUEL CONTROL switches are in the CUTOFF position.

 (2)  
Supply the electric power (AMM 24-22-00/201).

 S 715-293

 (3)  
Monitor the fuel leakage from the No. 1 engine fuel pump where you removed the drain plug.


 S 865-321
 NOTE: Allow the fuel leakage rate to stabilize.
____
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-22-00
 ALL  ú ú 16 Page 542 ú Jun 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 715-500
 (4)
Make sure the fuel leakage rate is not more than 5 cubic centimeters

 (cc)
 in 10 minutes.


 S 715-362
 (5)
Put these fuel pump control switches on the fuel management control module, M154, (pilots' overhead panel, P5) to the ON position:

 (a)  
MAIN 1 FWD

 (b)  
MAIN 1 AFT


 S 715-363
 (6)
Make sure the fuel leakage rate is not more than 5 cc in 10 minutes.

 S 715-364

 (7)  
Put these switches on the fuel manangement control module, M154, to the off position:

 (a)  
MAIN 1 FWD

 (b)  
MAIN 1 AFT


 S 715-365
 (8)
Continue this test (if necessary) for the other spar valves, or do this procedure: Put the Airplane Back to the Usual Condition.

 I.
Test the Spar Valve for the No. 2 Engine


 NOTE: This test makes sure that the spar valve is in the correct
____
 closed position.

 S 865-328
 (1)
Make sure the FUEL CONTROL switches are in the CUTOFF position.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 燃油 FUEL 2(96)