(2)
AMM 27-81-00/201, Leading Edge Flap System
(3)
AMM 28-41-04/401, Fuel Quantity Indicator
(4)
AIPC 28-21-04 Fig. 2
B.
Access
(1)
Location Zones
521 Leading Edge to Front Spar, Left
(2)
Access Panels
521BB Refuel Station Access Door
521CB Refuel Control Panel Access Door
C.
Procedure
S 864-005
(1)
Supply the electrical power (AMM 24-22-00/201).
S 864-002
(2)
Open these circuit breakers and attach DO-NOT-CLOSE tags:
(a)
On the main power distribution panel, P6: 1) 6D05, FUEL QTY 1 2) 6D06, FUEL QTY 2 3) 6F05, FUEL SYS MGMT CARD A 4) 6F06, FUEL SYS MGMT CH 1 5) 6F07, FUEL SYS MGMT CARD B 6) 6F08, FUEL SYS MGMT CH 2
(b)
On the DC power distribution panel, P180: 1) 180M8, FUELING VALVE 2 2) 180M9, FUELING PWR - HOT BAT 3) 180C25, FUELING LTS PANEL 4) 180C26, FUELING LTS RECP
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-21-16
ALL ú ú 06 Page 401 ú Oct 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
REFUEL RECEPTACLES PANEL, P42 REFUEL CONTROL
SEE A SEE A
REFUEL RECEPTACLE (REF) REFUEL RECEPTACLE (REF) SEE B PANEL, P42 REFUEL CONTROL
A ACCESS DOOR, 521CB FUELING CONTROL PANEL A
CENTER MAIN 2 MAIN 1
RESERVE 2
MAIN 3
A PANEL CONTROL REFUEL SEE C FASTENERS BONDING JUMPER BONDING JUMPERS
REFUEL CONTROL PANEL, P42
B
Figure 401 (Sheet 1) Refuel Control Panel
E23545
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-21-16
ALL ú ú 04 Page 402 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
ELECTRICAL
BONDING JUMPER FASTENERS
MAKE SURE THERE IS A MINIMUM
0.5 INCH CLEARANCE BETWEEN THE REFUEL CONTROL PANEL WIRE BUNDLES AND THE AIR DUCT.
Refuel Control Panel Figure 401 (Sheet 2)
E23608
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-21-16
ALL ú ú 01 Page 403 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
5) 180H17, FUEL SYS EICAS INTFC CONT
(c)
On the left power distribution center, P414:
1) 414F17, FUELING VALVE
2) 414F22, FUELING PWR
(d)
On the right power distribution center, P415:
1) 415M14, OVERFILL CONT
S 864-003
WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF THE LEADING
_______ EDGE AND TRAILING EDGE FLAPS AND FLAP DRIVE MECHANISMS BEFORE YOU MOVE THE FLAP CONTROL LEVER. WITH HYDRAULIC POWER REMOVED, THE FLAPS WILL MOVE AUTOMATICALLY BY ELECTRICAL POWER WHEN YOU MOVE THE FLAP CONTROL LEVER.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 燃油 FUEL 2(54)