32-11-61
ALL ú ú 01 Page 605 ú Nov 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
MAIN GEAR REACTION LINK - REMOVAL/INSTALLATION
______________________________________________
1. General
A. This procedure removes and installs the main gear reaction link.
TASK 32-11-71-004-001
2. Remove Main Gear Reaction Link (Fig. 401)______________________________
A. Special Tools and Equipment
(1) Thread Protector and Alignment Tool:
F80115-13 (F80115-4, Optional)
Use on 737-400 airplanes to protect the threads of the bolts which
connect the reaction link to the universal, and the uplock crank.
Use on 737-300/-500 airplanes to protect the threads of the bolt
which connects the reaction link to the side strut.
(2) Thread Protector and Alignment Tool:
F80115-17 (F80115-9, Optional) - Use on 737-400 airplanes to protect the threads of the bolt which connects the reaction link to the side strut.
F80115-12 (F80115-3, Optional) - Use on 737-300/-500 airplanes to protect the threads of the bolts which connect the reaction link to the universal, and the uplock crank.
(3)
Thread Protector and Alignment Tool- F80115-14 (F80115-5, Optional) Use on 737-300/-400/-500 airplanes to protect the threads of the bolt which connects the reaction link to the lock strut.
B.
Standard Tools and Equipment
(1)
Pins - Ground Lock
C.
References
(1)
AMM 07-11-11/201, Airplane Jacking
(2)
AMM 32-00-01/201, Ground Lockpins
(3)
AMM 32-32-91/401, Downlock Springs
D.
Access
(1)
Location Zones
310 Left Main Landing Gear
410 Right Main Landing Gear
E.
Remove the Main Gear Reaction Link
S 844-002
(1)
Make sure that the gear ground lockpins (AMM 32-00-01/201) are installed.
S 584-003
(2)
Lift the airplane on jacks until the wheels almost touch the ground (AMM 07-11-11/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-11-71
ALL ú ú 01 Page 401 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
SEE SEE SEE SEE B A E C
SEE D
FWD INBD
1. DOWNLOCK ACTUATOR
2. DOWNLOCK SPRING
LOCK STRUT 3. 4. LINK REACTION
Main Gear Reaction Link Installation Figure 401 (Sheet 1) A
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-11-71
ALL ú ú 01 Page 402 ú Oct 25/84
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
FWD INBD
14. KEEPER 4. REACTION LINK
1. DOWNLOCK ACTUATOR
3. LOCK
STRUT6. UPLOCK
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 1(100)