 (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific  lockwire-corrosion resistant steel 0.6 mm (0.0236 in) dia
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector 49-00-00-710-001 Self-Test of the ECB (59KD) (GTCP 36-300) 52-41-00-010-001 Open the APU Doors for Access  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


52-41-00-410-001 Close the APU Doors after Access 49-41-43-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 49-41-43-860-054
 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is OFF.

 (3)
 Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).


 (5)
 Make sure that the LT connector P10 is not connected to the ignition exciter.


 Subtask 49-41-43-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41


 Subtask 49-41-43-010-054
 C. Get Access
 (1)
 Make sure that the access platform is in position below the APU compartment.

 (2)
 Make sure that the APU access doors 315AL and 316AR are open (Ref. TASK 52-41-00-010-001).

 (3)
 Make sure that the light SW 11LJ is set to the ON position.


 4. Procedure
_________
 (Ref. Fig. 401/TASK 49-41-43-991-001) Subtask 49-41-43-420-050
 A. Installation of the Electrcal Lead - Igniter Plug
 (1)
 Do an inspection of the component interface and/or the adjacent area.

 (2)
 Clean the component interface and/or the adjacent area.

 (3)
 Remove the blanking cap and connect the ignition electrical lead (2) to the igniter plug (8031KM) (3) and the ignition unit (8030KM) (4).

 (4)
 Tighten and TORQUE the ignition electrical lead connector (2) to 0.4 m.daN (35.39 lbf.in).

 (5)
 Safety the ignition electrical lead connector (2) with lockwire-corrosion resistant steel 0.6 mm (0.0236 in) dia.

 (6)
 Remove the blanking cap and connect the electrical connector (1).

 (7)
 Safety the electrical connector (1) with lockwire-corrosion resistant steel 0.6 mm (0.0236 in) dia.

 (8)
 Make sure that the work area is clean and clear of tool(s) and other items.


 Subtask 49-41-43-865-052
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 1KD, 2KD.

 

 Subtask 49-41-43-710-050
 C. Do the self-test of the ECB (Ref. TASK 49-00-00-710-001).
 5. Close-up
________ Subtask 49-41-43-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Make sure that the light SW 11LJ is set to the OFF position.

 (3)
 Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).


 (4)
 Remove the access platform(s). Subtask 49-41-43-865-061

 B.
 Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 
中国航空网 www.aero.cn