B.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD.
R EFF : 001-049, 101-105, 107-107, 151-199, 49-32-13Page 408 201-210, Aug 01/05
CES Subtask 49-32-13-710-050
C. Do the operational test of the APU (Ref. TASK 49-00-00-710-010).
(1) Operate the APU for min. five minutes and examine the joints of the flow divider for leaks.
NOTE : Leaks are not permitted.
____
________
5. Close-up
Subtask 49-32-13-410-052
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).
(3)
Remove the access platform(s). Subtask 49-32-13-860-051
B.
Aircraft Maintenance Configuration
(1)
Pressurize the reservoirs of the hydraulic systems.
(Ref. TASK 29-14-00-614-002).
(2)
De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(3)
Remove the warning notice(s).
R EFF : 001-049, 101-105, 107-107, 151-199, 49-32-13Page 409 201-210, Aug 01/05
CES SOLENOID VALVE - APU FUEL SHUTOFF - REMOVAL/INSTALLATION
________________________________________________________ R **ON A/C 001-003, 051-099, 401-499,
TASK 49-32-17-000-001 Removal of the Fuel Shutoff Solenoid-Valve (8026KM) (GTCP 36-300) WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
WHEN YOU DO THE MAINTENANCE TASK(S).
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
No specific circuit breaker(s) safety clip(s)
No specific container 10 l (2.6416 USgal)
No specific access platform 2.5 m (8 ft. 2 in.)
B. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
3 packing 49-32-11 01 -090 4 packing 49-32-11 01 -100 5 packing 49-32-11 01 -110
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 52-41-00-010-001 Open the APU Doors for Access 49-32-17-991-001 Fig. 401
3. Job Set-up
__________
Subtask 49-32-17-860-050
A. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2)
On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.
(3)
Put a warning notice in the cockpit to tell persons not to start the APU.
(4)
Make sure that hydraulic systems are depressurized
(Ref. TASK 29-00-00-864-001).
Subtask 49-32-17-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU APU/FUEL/BLOW OFF/PUMP 2QC B14 121VU APU/FUEL/BLOW OFF/CTL 1QC K39 121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41 121VU APU/FUEL/LP VALVE/CTL 1QF M40 121VU APU/FUEL/LP VALVE/SPLY 2QF M39 121VU APU/FUEL/PUMP/CTL 3QC M38
Subtask 49-32-17-010-050
C. Get Access
(1)
Put the access platform in position below the APU access doors 315AL and 316AR.
(2)
Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).
(3)
Set the LIGHT control switch 11LJ to the on position.
4. Procedure
_________
(Ref. Fig. 401/TASK 49-32-17-991-001) Subtask 49-32-17-020-050
A. Removal of the Fuel Shutoff Solenoid Valve (8026KM)
(1)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER4(57)