• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:41来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-26-54Page 401 201-210, Aug 01/05
 CES


 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).

 

 Subtask 49-26-54-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-26-54-010-050
 C. Get Access
 (1)
 Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)
 Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT control SW 11LJ to the ON position.


 4. Procedure
_________ (Ref. Fig. 401/TASK 49-26-54-991-001) Subtask 49-26-54-020-050
 A. Removal of the Air/Oil Separator Adapter
 (1)
 Put the CONTAINER 10 L(2 1/2 USGAL) to the position below the air/oil separator adapter (1)

 (2)
 Remove the bolts (2), the washers (3) and the air/oil separator (1).

 (3)
 Remove the seal (6), the shims (7) and the packings (4, 5) from the air/oil separator adapter (1).

 (4)
 Discard the packings (4, 5).

 (5)
 Make a record of the shim thickness for installation.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-26-54Page 402 201-210, Aug 01/05
 CES


 Air/Oil Separator Adapter Figure 401/TASK 49-26-54-991-001 
R  EFF : 001-049, 101-105, 107-107, 151-199, 201-210,  49-26-54 Page 403 Aug 01/05
 CES 

 

 TASK 49-26-54-400-001 Installation of the Air/Oil Separator Adapter
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  Torque Wrench : range 36.00 to 220.00 lbf.in
 (0.40 to 2.60 m.daN)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 03-002  GB DEF-STAN 91-101 LUBRICATING OIL TURBINE ENGINE SYNT BASE (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
4 packing 49-26-09 01 -040 5 packing 49-26-09 01 -050

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-26-54Page 404 201-210, Aug 01/05
 CES


 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector 49-00-00-860-008 APU Start by External Power (131-9(A)) 49-00-00-860-009 APU Shutdown by External Power (131-9(A)) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access 49-26-54-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 49-26-54-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER4(7)