 Filter Preperation

 (1)
 Examine the fuel filter housing (6) for damage.

 (2)
 Lubricate the new packing (4) and packing (3) with FUELS (Material No. 01-002) or FUELS (Material No. 01-003).

 (3)
 Install the new packing (4) on the new filter element (5).

 (4)
 Install the new packing (3) in the filter orifice of the fuel control unit (1).

 (5)
 Locate the new filter element (5) on the filter port of the fuel control unit (1).

 (6)
 Install the fuel filter housing (6) on the fuel control unit (1). NOTE : The filter housing (6) should be turned clockwise until it is

____
 hand tight.


 (7)
 Press the fuel-filter differential-pressure indicator-plug (2A) inwards until it is flush with the housing (2).

 


 Subtask 49-32-11-865-064
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1QC, 2QC, 3QC, 1KD, 2KD, 1QF, 2QF.
 Subtask 49-32-11-870-055
 D. Purge the air from the APU fuel line (Ref. TASK 28-22-00-710-001). NOTE : When the fuel from the drain hose flows out free of air, release
____
 the fuel vent pushbutton.

 

 Subtask 49-32-11-790-051
 E. Leak Test
 (1)
 Clean and dry the fuel control unit and the filter housing with lint free cloth.

 (2)
 Start the APU (Ref. TASK 49-00-00-860-005).

 (3)
 Examine the fuel control unit and the filter housing for leaks. NOTE : No leaks are permitted.

____

 (4)
 Stop the APU (Ref. TASK 49-00-00-860-006).


 5. Close-up
________ Subtask 49-32-11-410-056
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).

 (3)
 Remove the access platform(s).


 (4)
 Remove the warning notice(s). Subtask 49-32-11-860-057

 B.
 Aircraft Maintenance Configuration.


 (1) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 CONTROL UNIT - FUEL - REMOVAL/INSTALLATION
__________________________________________ R **ON A/C 001-003, 051-099, 401-499,
 TASK 49-32-11-000-001
 Removal of the Fuel Control Unit (FCU) (8022KM) (GTCP 36-300)
 WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______ WHEN YOU DO THE MAINTENANCE TASK(S).
 WARNING : OBEY THE FUEL SAFETY PROCEDURES.
_______
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 No specific container 10 l (2.6416 USgal)
 No specific access platform 2.5 m (8 ft. 2 in.)
 98A28007570000 1 ADAPTER - VENT AND DRAIN VALVE, APU

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power 28-00-00-910-001 Fuel Safety Procedures 28-22-14-000-001 Removal of the APU Fuel LP-Switch 5030QM 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 52-41-00-010-001 Open the APU Doors for Access 49-32-11-991-001 Fig. 401


 3. Job Set-up
__________ Subtask 49-32-11-941-050
 A. Safety Precautions
 (1) Obey the Fuel Safety Procedures (Ref. TASK 28-00-00-910-001).
 (2)
 Make sure that ground fire extinguishing equipment is available. Subtask 49-32-11-860-065

 B.
 Aircraft Maintenance Configuration

 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 
中国航空网 www.aero.cn