• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:02来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 NOTE: Push in and turn the two magnetic plugs (3) 90°____
 until the two locking tabs engage the valve body
 of the two chip detectors (2). The red lines
 and grooves of the magnetic plug and valve body
 must be aligned together.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 49-27-04
 ALL  ú ú 03 Page 606 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 o) Do this task: Fill the APU Oil Tank (AMM 12-22-02/301). p) Do this task: APU Starting and Operation
 (AMM 49-11-00/201). q) Operate the APU for a minimum of 15 minutes. r) During the APU operation, examine the two chip
 detectors (2) for signs of oil leakage. s) Do this task: APU Usual Shutdown (AMM 49-11-00/201). t) If you find oil leakage, repair the cause of the oil
 leakage.
 H. Put the Airplane Back to Its Usual Condition
 S 416-016
 (1)  
Close the left APU access door, 317AL, and right APU access door, 318AR:

 (a)  
Remove the two quick-release pins, disconnect the two hold-open rods and put the two hold-open rods in the two clips on the right access door.

 (b)  
Install the two quick-release pins in the two brackets on the right APU compartment bulkhead.

 (c)  
Lift the right access door until you can install the lanyard on the pin at the aft APU compartment bulkhead.


 NOTE: The lanyard will hold the right access door on the APU
____
 compartment bulkhead.

 (d)  
Remove the two quick-release pins, disconnect the two hold-open rods and put the two hold-open rods in the two clips on the left access door.

 (e)  
Install the two quick-release pins in the two brackets on the left APU compartment bulkhead.

 (f)  
Make sure the insulation covers are correctly attach to the APU compartment firewall.

 (g)  
Lift the left access door until the two APU access doors are approximately aligned.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 49-27-04
 ALL  ú ú 03 Page 607 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
 (h) (i)  Close the two APU access doors.Close the six latches on the right access door.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 49-27-04
 ALL  ú ú 03 Page 608 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 AC GENERATOR DRIVE OIL SEAL -
_____________________________ REMOVAL/INSTALLATION
____________________
 1.  General_______
 A.  This procedure contains the task for the removal and the installation of the oil seal for the AC generator drive. You can use this task for the oil seals on the two AC generators.
 B.  The oil seal is on the forward end of the generator drive shaft in the load gearbox. You can get access to the oil seal through the APU access doors.
 TASK 49-27-05-004-001
 2.  AC Generator Drive Oil Seal Removal (Fig. 401)___________________________________
 A.  Special Tools
 (1)  PWC41382 Extractor - Pratt and Whitney Canada Inc
 1000 Marie Victorin
 Longueuil, Quebec
 Canada J4G 1A1
 Attention: Parts Division

 OR
 Kell-Strom Tool Company Inc 214 Church Street Wethersfield, CT 06109 USA
 B.  References
 (1)  
AMM 24-21-02/401, APU Generator QAD Ring

 (2)  
AMM 24-21-03/401, APU Driven Generator

 (3)  
AMM 24-22-00/201, Manual Control

 C.  
Access

 (1)  
Location Zone 318 APU Compartment-Load Gearbox Forward Face

 (2)  
Access Panel
 317AL APU Access Door
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 机载辅助动力 2(19)