• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:02来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (b)  
Install the two quick-release pins in the two brackets on the right APU compartment bulkhead.

 (c)  
Lift the right access door until you can install the lanyard on the pin at the aft APU compartment bulkhead.


 NOTE: The lanyard will hold the right access door on the APU
____
 compartment bulkhead.

 (d)  
Remove the two quick-release pins, disconnect the two hold-open rods and put the two hold-open rods in the two clips on the left access door.

 (e)  
Install the two quick-release pins in the two brackets on the left APU compartment bulkhead.

 (f)  
Make sure the insulation covers are correctly attach to the APU compartment firewall.

 (g)  
Lift the left access door until the two APU access doors are approximately aligned.

 (h)  
Close the two APU access doors.

 (i)  
Close the six latches on the right access door.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 49-94-01
 ALL  ú ú 03 Page 405 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 LOW OIL PRESSURE SWITCH - REMOVAL/INSTALLATION
______________________________________________
 1.  General
_______
 A.  This procedure has these tasks:
 (1)  
A removal of the low oil pressure switch

 (2)  
An installation of the low oil pressure switch.

 B.  
The low oil pressure switch is installed on the oil sensor housing. The oil sensor housing is on the bottom right side of the accessory gearbox.


 TASK 49-94-02-004-001
 2.  Low Oil Pressure Switch Removal (Fig. 401)
_______________________________
 A.  Access
 (1)  
Location Zones
 221 Control Cabin - Left
 222 Control Cabin - Right
 310 Fuselage - Station 2360 to Station 2792


 (2)  
Access Panels
 317AL APU Access Door - Left
 318AR APU Access Door - Right


 B.  
Prepare for the Removal


 S 864-002
 (1)  
Make sure the APU control switch on the P5 overhead panel is OFF and attach a DO-NOT-OPERATE tag.

 S 864-003

 (2)  
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 (a)  
P6-2 Main Power Distribution Panel
 1) 6K18, APU ALTN CONT


 (b)  
P83 Aft APU Equipment Control and Circuit Breaker Panel 1) APU PRIME CONT


 S 014-023
 (3)  
Open the left APU access door, 317AL, and right APU access door, 318AR:

 (a)  
While you hold the two APU access doors in the closed position, open the six latches on the right access door.


 NOTE: The left access door will open fully and the right
____ access door will drop approximately one inch (2.5 cm) from the fuselage frame when the last latch is opened.
 NOTE: A lanyard is attached to the aft end of the right access
____ door to hold the access door to the APU compartment bulkhead.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 49-94-02
 ALL  ú ú 01 Page 401 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 CAUTION: BE CAREFUL NOT TO MOVE THE TWO APU ACCESS DOORS TO THE
_______ OUTBOARD SIDE FROM THE FULL OPEN POSITION. THE FULL OPEN POSITION IS WHERE THE APU ACCESS DOOR IS DOWN AND THE TWO HOLD-OPEN RODS ARE CONNECTED TO THE TWO BRACKETS ON THE APU COMPARTMENT BULKHEAD. DAMAGE TO THE ELEVATOR CONTROL SURFACES CAN OCCUR.
 (b)  
Open the left access door to the fully open position and remove the two hold-open rods from the two clips.

 (c)  
Remove the two quick-release pins from the two brackets on the left APU compartment bulkhead.

 (d)  
Connect the two hold-open rods from the left access door to the two brackets and install the two quick-release pins.

 (e)  
Push the right access door up and remove the lanyard from the pin on the aft APU compartment bulkhead.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 机载辅助动力 2(159)