 Do this task: Override/Jettison Pump - Insulation Resistance Check.


 S 724-205
 NOTE: If the override/jettison pump is removed for inspection and
____ that override/jettison pump is re-installed at the same location from which it was removed, then the insulation resistance (IR) inspection is not necessary.
 TASK 28-31-01-704-187
 4. Override/Jettison Pump - Insulation Resistance Check (Fig. 402, 403)
____________________________________________________
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-31-01
 ALL  ú ú 02 Page 417 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

OVERRIDE/JETTISON PUMPS
SEE A
WIRE BUNDLE
SEE B WIRE BUNDLE CAP
A
ELECTRICAL CONNECTOR
PULL HERE FOR
PUMP REMOVAL

A
BONDING JUMPER
OVERRIDE JETTISON PUMP (EXAMPLE)
A
1
42
3
A-A

Fuel Override/Jettison Pump Insulation Resistance Check
Figure 402 (Sheet 1)

G85749
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-31-01
 ALL  ú ú 01 Page 418 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

ELECTRICAL WIRE BUNDLE CAP CONNECTOR
STATOR MOTOR AND IMPELLER SUBASSEMBLY  1 2 3 4 

1
BLACK
RED
2

MEGOHMMETER
3
GREEN OHMMETERBLUE 4

BRAIDED BONDING JUMPER
WIRE BUNDLE


Fuel Override/Jettison Pump Insulation Resistance Check
Figure 402 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-31-01
 ALL  ú
 ú  01  Page 419
 ú  Jun 18/00 

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
G56634
A
747-400
MAINTENANCE MANUAL

747 FUEL OVERRIDE/JETTISON PUMP INSPECTION DATA SHEET
AIRPLANE TAIL NBR:HRS/CYCLES:  DATE:
PUMP NAME  INSTALLED PUMP  RESIS-OHMSINTANCEGRND  RESISTANCE IN MEGOHMS(INSULATION CHECK)
PARTNBR  SERIALNBR  OVHL/NEWTSO/TSN  10V DC  500V DC 
PIN 4  PIN 1  PIN 2  PIN 3  PIN 1  PIN 2  PIN 3 
OVRD/JETTISON PUMPNBR 2 MAIN FWD
OVRD/JETTISON PUMPNBR 2 MAIN AFT
OVRD/JETTISON PUMPCTR WING TANK LEFT
OVRD/JETTISON PUMPCTR WING TANK RIGHT
OVRD/JETTISON PUMPNBR 3 MAIN FWD
NBR 3 MAIN AFTOVRD/JETTISON PUMP 

Fuel Override/Jettison Pump Inspection Data Sheet
Figure 403

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-31-01
 ALL  ú ú 01 Page 420 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
G56648
A
747-400
MAINTENANCE MANUAL

 A. General
 (1)  
This task does an on-wing insulation resistance check of the override/jettison pumps.

 (a)  
Do this task each time you install an override/jettison pump (new or servicable).

 (b)  
If the override/jettison pump is removed for inspection and that override/jettison pump is re-installed at the same location from which it was removed, then the insulation resistance (IR) inspection is not necessary.

 (2)  
When you use the QuadTech Type 1864 megohmmeter, it is recommended that the megohmmeter be insulated from any metal work stands. It is also recommended that protective clothing (rubber gloves, insulated shoes, etc.) be worn when you make these measurements. The megohmmeter should be plugged into a grounded receptacle to reduce the possibility of electrical shock.

 (3)  
 