28-31-00
ALL ú ú 16 Page 534 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
2) OVRD 2 AFT
3) OVRD 3 FWD
4) OVRD 3 AFT
G. Fuel Transfer Test - Jettison Transfer Valve for the No. 2 Main Tank -Valve Open
S 715-249
(1) Do these steps to open the jettison transfer valve in the No. 2 main tank.
NOTE: The jettison transfer valve is manually opened to make sure
____ the valve body and valve shaft are installed correctly. Test one jettison transfer valve at a time.
(a)
Have a person go out to the rear spar area in the wheel-well for the left wing landing gear.
(b)
Find the jettison transfer valve actuator for the No. 2 main tank (adjacent and outboard of the aft override/jettison pump).
(c)
Push the manual lever on the jettison transfer valve actuator to the OPEN position.
S 715-233
(2)
Make sure the MAIN 1 refuel valve switch is in the OPEN position.
S 715-226
(3)
Put these override/jettison pump switches on the fuel manangement control module, M154, to the ON position:
(a)
OVRD 2 FWD
(b)
OVRD 2 AFT
S 715-227
(4)
Monitor the fuel synoptic.
(a)
Make sure the fuel quantity for the No. 1 main tank increases.
(b)
Transfer a minimum of 600 lbs (300 kgs) of fuel.
NOTE: The fuel transfer with the jettison transfer valve
____ completely open should take approximately one minute.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-31-00
ALL ú ú 15 Page 535 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 715-228
(5)
If the fuel quantity in the No. 1 main tank increases, the jettison transfer valve for the No. 2 main tank is in the open position.
S 715-229
(6)
Close these switches on the fuel management control module, M154:
(a)
OVRD 2 FWD
(b)
OVRD 2 AFT
S 715-231
(7)
Have the person at the refuel control panel, P42, put the MAIN 1 refuel valve switch to the CLOSED position.
S 715-232
(8)
Put the manual lever on the jettison transfer valve to the CLOSED position.
H.
Fuel Transfer Test - Jettison Transfer Valve for the No. 3 Main Tank -Valve Open
S 715-254
(1) Do these steps to open the jettison transfer valve in the No. 3 main tank.
NOTE: The jettison transfer valve is manually opened to make sure
____ the valve body and valve shaft are installed correctly. Test one jettison transfer valve at a time.
(a)
Have a person go out to the rear spar area in the wheel- well for the right wing landing gear.
(b)
Find the jettison transfer valve actuator for the No. 3 main tank (adjacent and outboard of the aft override/jettison pump).
(c)
Push the manual lever on the jettison transfer valve actuator to the OPEN position.
S 715-234
(2) Have the person at the refuel control panel, P42, put the MAIN 4 refuel valve switch to the OPEN position.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-31-00
ALL ú ú 19 Page 536 ú Feb 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 715-219
(3)
Put these override/jettison pump switches on the fuel manangement control module, M154, to the ON position:
(a)
OVRD 3 FWD
(b)
OVRD 3 AFT
S 715-220
(4)
Monitor the fuel synoptic.
(a)
Make sure the fuel quantity for the No. 4 main tank increases.
(b)
Transfer a minimum of 500 lbs (300 kgs) of fuel.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 燃油 FUEL 4(15)