9 DO THE VSV FEEDBACK CABLE 
39 ADJUST THE VSV FEEDBACK STATIC RIGGING CHECKCABLE (AMM 75-31-02/501). 
(AMM 75-31-02/501). 
IS THE RIGGING CHECK CORRECT?
YES NO
10 DO THE VBV FEEDBACK CABLE 
40 ADJUST THE VBV FEEDBACK STATIC RIGGING CHECKCABLE (AMM 75-32-05/501). 
(AMM 75-32-05/501). 
IS THE RIGGING CHECK CORRECT?
DO THE VSV ACTUATOR RIG CHECK (AMM 75-31-00/501), THEN(AMM 75-31-00/501). ADJUST THE VSV FEEDBACK CABLE IS THE RIG CHECK CORRECT? (AMM 75-31-02/501). 
YES 
YES
13 USE A BORESCOPE AND 
EXAMINE THE BOOSTER, HPC 3RD-, 
5TH- AND 9TH-STAGE BLADES,
COMBUSTION CHAMBER AND HPT BLADES (AMM 72-00-00/601). IS DAMAGE MORE THAN THE LIMITS FOUND?
NO 
SEE SHEET 3 (BLOCK 14) 
Slow/Hung Acceleration 
Figure 101 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-42
 ALL  ú 
 ú  C01  Page 104 
 ú  Jul 15/98 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL //////////////////////// 
FROM SHEET 2 (BLOCK 13)
NO 
YES
14 CHECK LOW AND HIGH IDLE 
TOLERANCES (AMM 71-00-00/501, 
TEST 4).
IS ADJUSTMENT REQUIRED?
NO 
NO
15 ONLY ON ENGINES WITH THE 
5TH-STAGE START BLEED VALVE, 
ADJUST THE MEC SPECIFIC
GRAVITY TO THE LOW END OF THE PERMITTED RANGE FOR THE FUEL (AMM 71-00-58/501, FIG. 103). 
DOES THE PROBLEM CONTINUE? 
YES 
NO
16 ADJUST LOW AND HIGH IDLE 
SPEED TO THE HIGH END OF 
TOLERANCE (AMM 71-00-00/501,
TEST 4). DOES THE PROBLEM CONTINUE?
YES 
NO
17 DO THE VSV DYNAMIC RIG 
PROCEDURE (AMM 75-31-00/501).
 ADJUST THE VSVs TO THE 
OPEN LIMIT.
 DOES THE PROBLEM CONTINUE?
YES 
NO
CONTINUE TROUBLESHOOTING IF ADJUSTMENT WAS FOUND TO BE HIGH. 
Slow/Hung Acceleration 
Figure 101 (Sheet 3)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-42
 ALL  ú 
 ú  C01  Page 105 
 ú  Nov 15/98 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL //////////////////////// 
MENT THRUST LEVER MOVE-NO RESPONSE TO  PREREQUISITES ENGINE OPERATION CAN BE NECESSARY  
CHECK (AMM 71-00-59/101, FIG. 113). IS THE TRAVEL CHECK COR-RECT? 1 DO THE THRUST LEVER TRAVEL  NO  CABLE (AMM 76-11-07/401). LEVER CABLE (AMM 76-11-04/201) OR THE THRUST LEVER PUSH-PULL 21 REPAIR/REPLACE THE THRUST 
TEST (AMM 71-00-00/501, TEST (AMM 73-21-02/401) OR T2 
NO. 11).SENSOR (AMM 73-21-09/401), AS ARE THE SENSORS SERVICE-APPLICABLE. 
ABLE? 
YES
No Response to Thrust Lever Movement 
Figure 102
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-42
 ALL  ú 
 ú  C01  Page 106 
 ú  Nov 15/92 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL //////////////////////// 
PREREQUISITES ENGINE OPERATION CAN BE NECESSARY 
CANNOT GET TAKEOFF POWER WITH PMC "OFF"; PMC "ON OK" OR CANNOT GET TAKEOFF POWER WITH PMC "ON" AND PMC "OFF"
IS BLOCKAGE OR DAMAGE FOUND?
NO 
YES
3 DO THE PS12 TUBE/MANIFOLD 
CHECK (AMM 71-00-59/101, 
FIG. 106).
 ARE LEAKS FOUND? 
NO 
YES
5 EXAMINE THE CDP AND CBP 
TUBING, AND TUBE DRAIN HOLES, 
FOR LEAKS, DAMAGE, OR BLOCKAGE
(AMM 71-00-59/101, FIG. 104 AND 105). 
ARE LEAKS, DAMAGE, OR BLOCKAGE FOUND?
NO SEE SHEET 2 (BLOCK 7) 
Cannot Get Takeoff Power with PMC OFF; PMC ON OK or Cannot Get 
Takeoff Power with PMC ON and PMC OFF 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 动力装置 POWER PLANT 2(8)