• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-04 10:10来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 71-00-59
 ALL  ú ú C02 Page 126 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
F58705
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
4. FORWARD SUMP AIR FLOW TEST
A. DISCONNECT TGB OIL SUPPLY TUBE FROM TGB AND FORWARD OIL SUPPLY EXTERNAL TUBE. PLUG NIPPLE ON
FORWARD SUMP OIL SUPPLY EXTERNAL TUBE.

B. CONNECT THE TEST RIG AIR SUPPLY HOSE EQUIPPED WITH ADAPTER, 856A3267, TO FORWARD OIL TUBE
ASSEMBLY AT THE CONNECTION OF FORWARD BEARING SUPPLY HOSE TO THE LUBRICATION UNIT. TIGHTEN
THE ADAPTER TO 225-275 POUND-INCHES (25-31 N.m)

C. MEASURE THE AIR FLOW RATE.
D. DISCONNECT THE TEST RIG AIR SUPPLY HOSE.
E. CONNECT THE OIL TUBES.
F. TIGHTEN THE OIL SUPPLY TUBE COUPLING NUT TO 135-150 POUND INCHES (15.5-17 N.m).
G. TIGHTEN THE FORWARD OIL SUPPLY EXTERNAL TUBE COUPLING NUT TO 225-275 POUND INCHES (25-31 N.m).

S-M56-MM-03394-00-B
Engine Oil Circuit Air Flow Check Figure 116 (Sheet 4)
F58725
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 71-00-59
 ALL  ú ú C02 Page 127 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
TGB OIL FLANGE J  FLANGE K

B

S-M56-MM-03395-00-B
Engine Oil Circuit Air Flow Check Figure 116 (Sheet 5)
F58737
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 71-00-59
 ALL  ú ú C02 Page 128 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
LUBRICATION UNIT
FORWARD SUMP OIL SUPPLY HOSE
OIL SUPPLY TUBE
C
S-M56-MM-03396-00-B
Engine Oil Circuit Air Flow Check Figure 116 (Sheet 6)
F58739
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 71-00-59
 ALL  ú ú C02 Page 129 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
5. TGB AIR FLOW TEST
A. ON THE TGB, AT 9 O'CLOCK AFT LOOKING FORWARD, REMOVE THE TGB OIL SUPPLY TUBE.
____FOR FORWARD SUMP TEST, THIS TUBE HAS ALREADY BEEN DISCONNECTED FROM FORWARD OIL SUPPLY
NOTE:
EXTERNAL AIR TUBE.

B. CONNECT THE TEST RIG AIR SUPPLY HOSE TO THE TGB CONNECTION.
C. MEASURE THE AIR FLOW RATE.
D. DISCONNECT THE TEST RIG AIR SUPPLY HOSE.
E. CONNECT THE TGB OIL SUPPLY TUBE
(1) TIGHTEN THE COUPLING NUTS TO 283 POUND-INCHES (32 N.m)

TGB OIL
TGB CONNECTION

PLUG HERE

D
S-M56-MM-03397-00-B
Engine Oil Circuit Air Flow Check Figure 116 (Sheet 7)
F58731
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 71-00-59
 ALL  ú ú C02 Page 130 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
6. AGB AIR FLOW TEST
A. ON THE REAR OF THE AGB, AT 7 O'CLOCK AFT LOOKING FORWARD, REMOVE THE SUPPLY TUBE ROUTED BETWEEN
THE AGB AND THE LUBRICATION UNIT.

B. CONNECT THE TEST RIG AIR SUPPLY HOSE TO THE AGB.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 动力装置 POWER PLANT 2(100)