• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 23:22来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (3)  On a lens attached with screws and nutplates, install the new lens.
 (a)  
Remove old seal and prepare surface for sealing
 (AMM 51-31-00/201).


 (b)  
Apply the parting tape to all the surfaces that connect on the lens assembly.


 NOTE: The parting agent can be used as an alternative to the
____
 teflon tape (AMM 51-31-00/201).

 (c)  
Make a new seal (AMM 51-31-00/201).

 (d)  
Put the new lens assembly in its position.

 (e)  
Put the screws that were removed from the used lens assembly into the holes in the new lens assembly.

 (f)  
Tighten the screws.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 33-42-21
 ALL  ú ú 02 Page 405 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL

RING RETAINER
NOTE: THE ROUNDED EDGE OF THE
RING RETAINER MUST BE NEAREST
TO THE HEAD OF THE STUD

LENS ASSEMBLY - HOLE TOLERANCES FOR A STUD AND RING RETAINER
____ALL DIMENSIONS
NOTE: ARE IN INCHES.
Lens Assembly for the Inboard Landing and Runway Turnoff Lights Figure 402
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 33-42-21
 ALL  ú ú 02 Page 406 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 424-068
 (4)  On a lens attached with quick-release fasteners, install the new lens.
 (a)  Spotface the lens assembly frame at each of the ring retainer locations (Fig. 402).
 NOTE: This step is necessary to make sure the lens cover will
____ correctly engage with the leading edge surface. If you do not spotface the lens frame at each hole, do not use the ring retainers.
 (b)  
Put the studs through the holes in the new lens assembly.

 (c)  
Attach the ring retainers on the studs (See Fig. 402 for the proper installation procedures).


 NOTE: Make sure the lens assembly and the landing light
____
 retainer do not touch.

 (d)  
Remove old seal and prepare surface for sealing
 (AMM 51-31-00/201).


 (e)  
Apply a parting agent to all the surfaces that connect on the lens assembly (AMM 51-31-00/201).

 (f)  
Make a new seal (AMM 51-31-00/201).

 (g)  
Put the new lens assembly in its position.

 (h)  
Tighten the quick-release fasteners.


 S 094-071
 WARNING: YOU MUST CAREFULLY DO THE STEPS IN THE TASK BELOW TO REMOVE THE
_______ LEADING EDGE FLAP AND SLAT LOCKS CORRECTLY. THE LEADING EDGE FLAPS AND SLATS CAN MOVE QUICKLY IF YOU DO NOT REMOVE THE LOCKS CORRECTLY. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (5)  Do this task: "Leading Edge Flap and Slat Locks Removal" (AMM 27-81-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 33-42-21
 ALL  ú ú 03 Page 407 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 INBOARD LANDING LIGHTS - MAINTENANCE PRACTICES
______________________________________________
 1.  General_______
 A.  This procedure contains the task for the replacement of the lamp in the inboard landing light (referred to as the light).
 B.  Each inboard landing light is adjacent to a runway turnoff light. The two lights are behind one lens.
 C.  The inboard landing lights are in a fuel vapor area. Each lamp, electrical connection, and lens has a seal to stop all fuel fumes and water.
 TASK 33-42-31-962-008
 2.  Inboard Landing Lights Lamp Replacement (Fig. 201)_______________________________________
 A.  Consumable Materials
 (1)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 灯 LIGHTS(62)