• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 23:22来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Lower the light assembly to the full open position.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 33-28-00
 ALL  ú ú 05 Page 201 ú Nov 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 962-032
 (3) Carefully replace the lamp.
 D. Lamp Test
 S 862-003
 (1)
Supply electrical power (AMM 24-22-00/201).

 S 862-004

 (2)
Remove each DO-NOT-OPERATE or DO-NOT-CLOSE tag.


 (a) Close each circuit breaker that was opened.
 S 862-005
 (3) Set the switch to the on position.
 (a) Make sure the new lamp comes on correctly.
 S 862-006
 (4)
Set the switch to the usual position.

 S 412-007

 (5)
Close the light assembly.

 (a)
Lift the light assembly and connect the short lanyard.

 (b)
Lift the light assembly into its position and close the latch.

 


 S 862-019
 (6) Remove electrical power if it is not necessary (AMM 24-22-00/201).
 TASK 33-28-00-712-004
 3. Entry, Threshold, and Attendant's Work Lights - Operational Test
________________________________________________________________
 A. References
 (1)
AMM 24-22-00/201, Manual Control

 (2)
SSM 33-26-00, 33-29-00

 (3)
WDM 33-26-11, 33-29-01


 B. Access
 (1)  Location Zone
 100 Upper Half of Fuselage

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 33-28-00
 ALL  ú ú 01 Page 202 ú Nov 15/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 C. Procedure
 S 862-022
 (1)  
Supply electrical power (AMM 24-22-00/201).

 S 862-008

 (2)  
At the attendant's panel, set each switch for the entry, threshold, and attendant's work lights to the on or dim position.


 (a)  Make sure each entry, threshold, and attendant's work light comes on correctly.
 S 862-009
 (3)  For each switch with a bright position, set the switch to the bright position.
 (a)  Make sure each light connected to the switch becomes bright.
 S 862-010
 (4)  Set each switch to the off position.
 (a)  Make sure each light goes off.
 TASK 33-28-00-712-009
 4.  Airstair Lights - Operational Test__________________________________
 A. References
 (1)  
AMM 24-22-00/201, Manual Control

 (2)  
AMM 52-61-10/201, Forward Airstairs

 (3)  
SSM 33-46-00

 (4)  
WDM 33-00-01, Lamp Usage Chart

 (5)  
WDM 33-46-01 thru 33-46-99


 B. Access
 (1)  Location Zone
 100 Upper Half of Fuselage

 C. Procedure
 S 862-025
 (1)  Supply electrical power (AMM 24-22-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 33-28-00
 ALL  ú ú 03 Page 203 ú Nov 15/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (2)  S 862-012Extend the airstairs to approximately 1/2 of their full extension (AMM 52-61-10/201).
 NOTE:____ The airstair lights will not come on if the airstairs are fully retracted.
 (3)  S 862-013At the attendant's airstairs panel, P29, set the switch for the airstair lights to the on position. (a) Make sure the airstair lights come on.
 (4)  S 862-014Set the switch to the off position. (a) Make sure the airstair lights go off.
 (5)  S 862-015Set the switch to the automatic position.
 (6)  S 862-016Fully extend the airstairs. (a) Make sure the airstair lights come on automatically when the airstairs are fully extended.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 灯 LIGHTS(48)