Apply engine-driven generator power from IDG 1 to the left synchronous bus (AMM 24-22-00/201).

 (c)  
Close these circuit breakers:

 1)  On the P514 panel: a) C8013 Lightning Prot Phase A b) C8014 Lightning Prot Phase B c) C8015 Lightning Prot Phase C

 (d)  
Make sure bus tie breaker BTB 1 remains closed.

 (e)  
Make sure the lightning protector circuit breakers that are listed above remain closed.

 (f)  
Remove the electrical power if no longer required.


 S 764-018
 (2)  
To test the installation of the lightning protector associated with the 115 VAC Bus 2, do the steps that follow:

 (a)  
Open these circuit breakers:

 1)  On the P614 panel: a) C8019 Lightning Prot Phase A b) C8020 Lightning Prot Phase B c) C8021 Lightning Prot Phase C

 (b)  
Apply engine-driven generator power from IDG 2 to the left synchronous bus (AMM 24-22-00/201).

 (c)  
Close these circuit breakers

 1)  On the P614 panel: a) C8019 Lightning Prot Phase A b) C8020 Lightning Prot Phase B c) C8021 Lightning Prot Phase C

 (d)  
Make sure bus tie breaker BTB 2 remains closed.

 (e)  
Make sure the lightning protector circuit breakers that are listed above remain closed.

 (f)  
Remove the electrical power if no longer required.


 S 764-019
 (3)  
To test the installation of the lightning protector associated with the 115 VAC Bus 3, do the steps that follow:

 (a)  
Open these circuit breakers:


 1)  On the P515 panel: a) C8026 Lightning Prot Phase A b) C8025 Lightning Prot Phase B c) C8024 Lightning Prot Phase C
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-21-04
 ALL  ú ú 01 Page 406 ú Feb 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (b)  
Apply engine-drive generator power from IDG 3 to the right synchronous bus (AMM 24-22-00/201).

 (c)  
Close these circuit breakers:

 1)  On the P515 panel:
 a) C8026 Lightning Prot Phase A
 b) C8025 Lightning Prot Phase B
 c) C8024 Lightning Prot Phase C


 (d)  
Make sure bus tie breaker BTB 3 remains closed.

 (e)  
Make sure the lightning protector circuit breakers that are listed above remain closed.

 (f)  
Remove the electrical power if no longer required.


 S 764-020
 (4)  
To test the installation of the lightning protector associated with the 115 VAC Bus 4, do the steps that follow:

 (a)  
Open these circuit breakers:

 1)  On the P615 panel:
 a) C8016 Lightning Prot Phase A
 b) C8017 Lightning Prot Phase B
 c) C8018 Lightning Prot Phase C


 (b)  
Apply engine-driven generator power from IDG 4 to the right synchronous bus (AMM 24-22-00/201).

 (c)  
Close these circuit breakers:

 1)  On the P615 panel:
 a) C8016 Lightning Prot Phase A
 b) C8017 Lightning Prot Phase B
 c) C8018 Lightning Prot Phase C


 (d)  
Make sure bus tie breaker BTB 4 remains closed.

 (e)  
Make sure the lightning protector circuit breakers that are listed above remain closed.

 (f)  
Remove the electrical power if no longer required.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-21-04
 ALL  ú ú 01 Page 407 ú Feb 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 LIGHTNING PROTECTOR - ADJUSTMENT/TEST
_____________________________________
 1.  General
_______
 A.  This procedure has two tasks to do a test of the lightning protectors.
 (1)  
One task tests individual lightning protector.

 (2)  
One task test the lightning protectors in the generator control panels.
 