(b)
Apply engine-driven generator power from IDG 1 to the left synchronous bus (AMM 24-22-00/201).
(c)
Close these circuit breakers:
1) On the P514 panel: a) C8013 Lightning Prot Phase A b) C8014 Lightning Prot Phase B c) C8015 Lightning Prot Phase C
(d)
Make sure bus tie breaker BTB 1 remains closed.
(e)
Make sure the lightning protector circuit breakers that are listed above remain closed.
(f)
Remove the electrical power if no longer required.
S 764-018
(2)
To test the installation of the lightning protector associated with the 115 VAC Bus 2, do the steps that follow:
(a)
Open these circuit breakers:
1) On the P614 panel: a) C8019 Lightning Prot Phase A b) C8020 Lightning Prot Phase B c) C8021 Lightning Prot Phase C
(b)
Apply engine-driven generator power from IDG 2 to the left synchronous bus (AMM 24-22-00/201).
(c)
Close these circuit breakers
1) On the P614 panel: a) C8019 Lightning Prot Phase A b) C8020 Lightning Prot Phase B c) C8021 Lightning Prot Phase C
(d)
Make sure bus tie breaker BTB 2 remains closed.
(e)
Make sure the lightning protector circuit breakers that are listed above remain closed.
(f)
Remove the electrical power if no longer required.
S 764-019
(3)
To test the installation of the lightning protector associated with the 115 VAC Bus 3, do the steps that follow:
(a)
Open these circuit breakers:
1) On the P515 panel: a) C8026 Lightning Prot Phase A b) C8025 Lightning Prot Phase B c) C8024 Lightning Prot Phase C
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-21-04
ALL ú ú 01 Page 406 ú Feb 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(b)
Apply engine-drive generator power from IDG 3 to the right synchronous bus (AMM 24-22-00/201).
(c)
Close these circuit breakers:
1) On the P515 panel:
a) C8026 Lightning Prot Phase A
b) C8025 Lightning Prot Phase B
c) C8024 Lightning Prot Phase C
(d)
Make sure bus tie breaker BTB 3 remains closed.
(e)
Make sure the lightning protector circuit breakers that are listed above remain closed.
(f)
Remove the electrical power if no longer required.
S 764-020
(4)
To test the installation of the lightning protector associated with the 115 VAC Bus 4, do the steps that follow:
(a)
Open these circuit breakers:
1) On the P615 panel:
a) C8016 Lightning Prot Phase A
b) C8017 Lightning Prot Phase B
c) C8018 Lightning Prot Phase C
(b)
Apply engine-driven generator power from IDG 4 to the right synchronous bus (AMM 24-22-00/201).
(c)
Close these circuit breakers:
1) On the P615 panel:
a) C8016 Lightning Prot Phase A
b) C8017 Lightning Prot Phase B
c) C8018 Lightning Prot Phase C
(d)
Make sure bus tie breaker BTB 4 remains closed.
(e)
Make sure the lightning protector circuit breakers that are listed above remain closed.
(f)
Remove the electrical power if no longer required.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-21-04
ALL ú ú 01 Page 407 ú Feb 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
LIGHTNING PROTECTOR - ADJUSTMENT/TEST
_____________________________________
1. General
_______
A. This procedure has two tasks to do a test of the lightning protectors.
(1)
One task tests individual lightning protector.
(2)
One task test the lightning protectors in the generator control panels.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 ELECTRICAL POWER 电源 1(93)