 TASK 21-29-02-004-001
Crew Rest Area Smoke Mode Shutoff Valve Removal (Fig. 401)

_______________________________________________

 A.  References
 (1)  
SSM 21-45-08

 (2)  
WDM 21-45-61


 B.  Access
 (1)  Location Zone
 225 Aft Upper Deck, LH

 C.  Prepare for Removal
 S 864-002
 (1) Open this circuit breaker and attach a DO-NOT-CLOSE identifier:
 (a)  D.C. Power Distribution Panel, P180
 1) 180G25, UPR DK CREW REST SMK EVAC VLV

 S 014-003
 (2)  Get access to the shutoff valve through the access door on the aft end of the crew rest area.
 D.  Remove the Shutoff Valve
 S 034-004
 (1)
Remove the electrical connector, DV553, from the shutoff valve.

 S 034-005

 (2)
Remove the two clamps that attach the shutoff valve to the ducts.

 S 034-006

 (3)  
Remove the two plastic straps that attach the shutoff valve to the support bracket.

 S 024-007

 (4)  
Remove the shutoff valve.


 TASK 21-29-02-404-008
Crew Rest Area Smoke Mode Shutoff Valve Installation Fig. 401)

____________________________________________________

 A.  References
 (1)  AMM 24-22-00/201, Manual Control
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-29-02
 ALL  ú ú 01F Page 401 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

CREW REST AREA SMOKE MODE SHUTOFF VALVE
SEE A
VALVE POSITION
INDICATOR

ELECTRICAL CONNECTOR
CLAMP (2 LOCATIONS)
PLASTIC STRAP VALVE (2 LOCATIONS)
FWD
A
Crew Rest Area Smoke Mode Shutoff Valve Installation

Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-29-02
 ALL  ú ú 01F Page 402 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C78901
A
747-400
MAINTENANCE MANUAL

 (2)  
SSM 21-45-08

 (3)  
WDM 21-45-61


 B. Access
 (1)  Location Zone
 225 Aft Upper Deck, LH

 C. Install the Valve
 S 984-009
 (1)  Put the shutoff valve in its position between the ducts.
 (a)  Install the valve with the flow arrow pointing forward and the valve actuator oriented outboard.
 S 434-010
 (2)  
Install the two plastic straps that attach the shutoff valve to the support bracket.

 S 434-011

 (3)
Install the two clamps that attach the shutoff valve to the ducts.

 S 434-012

 (4)  
Install the electrical connector, DV553, on the valve.

 S 864-013

 (5)
Remove the DO-NOT-CLOSE identifier and close this circuit breaker:


 (a)  D.C. Power Distribution Panel, P180
 1) 180G25, UPR DK CREW REST SMK EVAC VLV

 D. Do an Installation Test of the Shutoff Valve
 S 864-014
 (1)  
Supply electrical power (AMM 24-22-00/201).

 S 864-015

 (2)  
Make sure that the shutoff valve is open.


 NOTE: There is a position indicator on the valve.
____
 S 864-016
 (3)  
Make sure that the CREW REST RESET switch-light on the crew rest area attendant's panel is not on.

 S 864-017

 (4)  
Push the the Self Test button on one of the smoke detectors in the crew rest area.


 NOTE: The Self Test button is the second button from the green
____
 power lamp.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-29-02
 ALL  ú ú 01F Page 403 ú Oct 10/93