• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:15来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 21-26-09
 ALL  ú ú 02 Page 202 ú Jun 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 WARNING:_______ MAKE SURE THE CIRCUIT BREAKERS IN THE SUBSEQUENT STEP ARE
 OPENED.  IF THEY ARE NOT OPENED, THE FIRE EXTINGUISHER
 BOTTLES COULD RELEASE THEIR CONTENTS AND CAUSE INJURY TO

 PERSONEL.
 (a)  Open these circuit breakers on the main power distribution panel, P6, and attach DO-NOT-CLOSE identifiers: 1) 6H6, FIRE EXTINGUISHER LOWER CARGO 2) 6H7, FIRE EXTINGUISHER MN DK CARGO

Bulk Cargo Flapper Valve Solenoid - Maintenance Practices
Figure 201 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-26-09
 ALL  ú ú 01 Page 203 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (b)  
Set the CARGO FIRE AFT switch on the P5 overhead panel to the ARMED position.

 WARNING:_______KEEP YOUR HANDS CLEAR OF THE FLAPPER VALVE DOOR. THE STEP THAT FOLLOWS WILL CAUSE THE FLAPPER VALVE DOOR TO CLOSE.

 (c)  
Push the RESET switch on the flapper valve assembly.


 NOTE: The plunger pin on the solenoid must retract when the
____ RESET switch is pushed. If the plunger pin does not retract, manually push the plunger pin into the solenoid to disengage the valve linkage.
 (d)  
Set the CARGO FIRE AFT switch on the P5 overhead panel to the OFF position.

 (e)  
Remove the DO-NOT-CLOSE identifiers and close these circuit breakers: 1) 6H6, FIRE EXTINGUISHER LOWER CARGO 2) 6H7, FIRE EXTINGUISHER MN DK CARGO


 S 032-008
 (5)  Remove the electrical connector from the valve solenoid (left valve
 -DV488, right valve - DV489).
 S 032-019
 (6)  
Remove the bolt, spacer, washer, and nut (2 locations) from the clamp on the solenoid and remove the clamp.

 S 022-008

 (7)  
Remove the bolt, spacer, washer, and nut (2 locations) that hold the solenoid to the bracket and remove the solenoid.

 S 032-020

 (8)  
Remove the plunger pin from the solenoid.


 TASK 21-26-09-402-010
 3.  Install the Bulk Cargo Flapper Valve Solenoid_____________________________________________
 A. References
 (1)  
24-22-00/201, Manual Control

 (2)  
25-55-02/401, Ceiling and Sidewall Lining

 (3)  
IPC 21-26-55 Fig. 2

 (4)  
WDM 21-28-31

 (5)  
SSM 21-28-03


 B. Access
 (1)  Location Zones
 145 Bulk Cargo Compartment, Left
 146 Bulk Cargo Compartment, Right

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-26-09
 ALL  ú ú 02 Page 204 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 C. Procedure
 S 432-011
 (1)  
Install the plunger pin into the solenoid.

 S 422-012

 (2)  
Hold the solenoid in its position and install the bolt through the washer, solenoid, spacer, bracket, and nut (2 locations).

 S 432-013

 (3)  
Install the bolts, spacers, washers, and nuts that hold the clamp on the solenoid (2 locations).

 S 432-016

 (4)  
Install the electrical connector on the valve solenoid (left valve -DV488, right valve - DV489).

 S 822-015

 (5)  
Set the valve to the open position:


 WARNING: MAKE SURE THE CIRCUIT BREAKERS IN THE SUBSEQUENT STEP ARE
_______ OPENED. IF THEY ARE NOT OPENED, THE FIRE EXTINGUISHER BOTTLES COULD RELEASE THEIR CONTENTS AND CAUSE INJURY TO PERSONEL.
 (a)  
Open these circuit breakers on the main power distribution panel, P6, and attach DO-NOT-CLOSE identifiers: 1) 6H6, FIRE EXTINGUISHER LOWER CARGO 2) 6H7, FIRE EXTINGUISHER MN DK CARGO

 (b)  
Set the CARGO FIRE AFT switch on the P5 overhead panel to the ARMED position.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 1(65)