(b)
P414 Main Power Distribution panel
1) 414M8 CABIN PRESS ICU LEFT
2) 414B8 CABIN PRESS ICU RIGHT
(c)
P83 in aft equipment center
1) OUTFLOW VALVE-R
2) OUTFLOW VALVE-L
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-31-07
ALL ú ú 01 Page 401 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
ACCESS DOOR
SEEA
SAFETY
SCREEN
DC MOTOR
GEAR CASE HOUSING
LEVER ARM
CONNECTING
ROD BOLT
CONNECTING ROD
GATE FRAME
A
AC MOTOR
POSITION
POTENTIOMETER
CONNECTOR
BOLT (2 LOCATIONS) WASHER (2 LOCATIONS) LAMINATED SHIM BOLT (3 LOCATIONS) BRACKET
Pressurization Outflow Valve Actuator Assembly Installation
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-31-07
ALL ú ú 01 Page 402 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 014-003
(2)
Remove the access panel from the aft bulkhead of the bulk cargo compartment to get access to the outflow valves.
S 034-004
(3)
Remove the safety screen.
S 034-005
(4)
Remove the electrical connectors from the outflow valve:
(a)
The DC motor electrical connectors DV90C-right or DV91C-left
(b)
The AC motor electrical connector DV90A-right or DV91A-left
(c)
The position potentiometer electrical connector DV90B - right or DV91B - left.
S 034-007
(5)
Remove the connecting rod bolt.
S 034-008
(6)
Remove the bolt that holds the actuator to the gate frame.
S 034-009
(7)
Remove the bolt that holds the gearcase housing to the bracket.
S 024-010
(8)
Remove the outflow valve actuator assembly. Make sure the laminated shims stay in their position on the bracket.
TASK 21-31-07-404-011
3. Pressurization Outflow Valve Actuator Installation__________________________________________________
A. References
(1)
AMM 21-31-00/501, Cabin Pressure Control System
(2)
24-22-00/201, Manual Control
(3)
IPC 21-31-01 Fig. 1
(4)
WDM 21-31-13, 21-31-21, 21-31-22
(5)
SSM 21-31-02, 21-31-04
B. Access
(1) Location Zone
151 Area Aft of Bulk Cargo Compartment, LH
152 Area Aft of Bulk Cargo COmpartment, RH
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-31-07
ALL ú ú 01 Page 403 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
C. Procedure
S 434-024
(1)
Make sure the laminated shim is in its position on the bracket.
S 424-012
(2)
Put the actuator in its position on the valve frame and install the bolts and washers. Do not tighten the bolts.
NOTE:____The shim is permanently bonded to the structure. Adjustment of the shim is not necessary.
S 434-013
(3)
Install the bolts that hold the actuator to the frame, and tighten all the bolts.
S 434-014
(4)
Install the connecting rod bolt, washers, nut and cotter pin.