 A.  References
 (1)  
AMM 21-28-00/501, Cargo Compartment Conditioned Air Distribution

 (2)  
24-22-00/201, Manual Control

 (3)  
IPC 73-21-80 Fig. 1

 (4)  
SSM 21-28-01

 (5)  
WDM 21-28-14


 B.  Access
 (1)  Location Zone
 115 Area Between Nose Gear Well and Fuselage, LH

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-28-06
 ALL  ú ú 02F Page 401 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

FORWARD ELECTRICAL SYSTEMS CARDFILE, M7603
SEE A
ECS FREIGHTER CARD
A
ECS Freighter Card Installation Figure 401
C76049
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-28-06
 ALL  ú ú 01F Page 402 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 C. Procedure
 S 424-005
 (1)  
Install the ECS Freighter card in the M7603 forward electrical systems card file.

 S 864-006

 (2)  
Remove the DO-NOT-CLOSE identifier and close this P6 panel circuit breaker:


 (a)  6E34, A/C CONT CARGO - PCA
 S 864-007
 (3)  
Supply electrical power (AMM 24-22-00/201).

 S 744-008

 (4)  
Do this ground test on any CMC CDU (AMM 21-28-00/501):

 (a)  
Select GROUND TEST on the CMC CDU.

 (b)  
Select chapter 21 AIR CONDITIONING.

 (c)  
Select SHUTOFF / DUMP VLV.

 (d)  
Make sure NO TEST RESPONSE does not show on the CMC CDU.

 (e)  
Make sure IN PROGRESS is shown on the CMC CDU.

 (f)  
Make sure PASS is shown on the CMC CDU.

 


 S 864-009
 (5)  Remove the electrical power if it is not necessary
 (AMM 24-22-00/201).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-28-06
 ALL  ú ú 02F Page 403 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 AFT CARGO COMPARTMENT CONDITIONED AIR CHECK VALVE - REMOVAL/INSTALLATION
________________________________________________________________________
 1.  General_______
 A.  This procedure gives instructions to remove and install the aft cargo compartment conditioned air check valve. To get access to the check valve, you must go through the forward right sidewall lining in the aft cargo compartment.
 TASK 21-28-07-004-001
 2.  Conditioned Air Check Valve Removal (Fig. 401)___________________________________
 A.  References
 (1)  
AIPC 21-28-00 Fig. 12

 (2)  
AMM 25-52-01/401, Containerized Cargo Compartment Ceiling and Sidewall Lining

 (3)  
AMM 36-00-00/201, pneumatic power


 B.  Access
 (1)  Location Zone
 142 Aft Cargo Compartment, RH

 C.  Procedure
 S 864-026
 (1)  
Depressurize the pneumatic system (AMM 36-00-00/201).

 S 864-010

 (2)  
Make sure you turn all three pack select switches to OFF and attach a DO-NOT-OPERATE tag on the switches.

 S 014-019

 (3)  
Open the aft cargo compartment door.

 S 014-020

 (4)  
Remove the right sidewall lining at the forward end of the aft cargo compartment to get access to the check valve (AMM 25-52-01/401).

 (5)  
Remove the coupling and the clamp from two sides of the check valve.

 (6)  
Remove the check valve from the sleeve.

 (7)  
Put a covers on the ducts to keep out unwanted materials.
 