747-400
MAINTENANCE MANUAL
HEATER CONTROL
LOW MED
HIGHOFF
SEE D
SEE C (2 PLACES) HEATER SHOULDER SEE B CREW REST AREA HEAT CONTROLLER B
FLIGHT DECK CREW REST AREA AIR DISTRIBUTION
HEATER
DUCT C
FLIGHT DECK CREWREST HEATER
FLIGHT DECK AIR DISTRIBUTION
D
Supplemental Heaters - Component Location Figure 1 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-42-00
ALL ú ú 01 Page 3 ú Feb 10/89
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
115V AC
BUS 1 .B
115V AC
BUS 1 .C
115V AC
BUS 1 .B
115V AC
BUS 1 .C
P414 R985 ALT SYSPOWER DISTRIBUTION AIR/GND RELAYCENTER-LEFT
Flight Deck Supplemental Heating Schematic Figure 2
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-42-00
ALL ú ú 01 Page 4 ú Oct 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
FLIGHT CREW FOOT HEATER - REMOVAL/INSTALLATION
______________________________________________
1. General_______
A. There are two tasks in this procedure. There is one task for the removal and one task for the installation of a flight crew foot heater. The procedure has these parts:
(1)
The removal of power to the heaters
(2)
The removal of a main deck ceiling panel to get access to the heater electrical connector
(3)
The removal of the heater
(4)
The installation of the heater
(5)
A functional test of the heater.
TASK 21-42-01-004-001
2. Flight Crew Foot Heater Removal (Fig. 401)_______________________________
A. References
(1) IPC 21-41-52 Fig. 1
B. Access
(1) Location Zones
221 Control Cabin, LH
222 Control Cabin, RH
C. Procedure
S 864-013
(1) For the captain's foot heaters, open these circuit breakers and attach DO-NOT-CLOSE tags:
(a) P414 Power Distribution Center - Left 1) 414H10 AUX HEAT PWR CAPT HIGH 2) 414H11 AUX HEAT PWR CAPT LOW
S 864-014
(2) For the first officer's foot heaters, open these circuit breakers and attach DO-NOT-CLOSE tags:
(a) P414 Power Distribution Center - Left 1) 414H12 AUX HEAT PWR F/O HIGH
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-42-01
ALL ú ú 03 Page 401 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
2) 414H13 AUX HEAT PWR F/O LOW
S 024-002
(3) Remove the flight crew foot heater.
(a)
Disconnect the electrical connector in the ceiling space of the main deck cabin. 1) Captain's foot heaters, DH519-left and DH520-right. 2) First officer's foot heater, DH521-left and DH522-right.
(b)
Remove the 12 screws from around the foot heater and remove the foot heater. Remove the electrical connector through the hole in the floor.
TASK 21-42-01-404-003
3. Flight Crew Foot Heater Installation____________________________________
A. Consumable Materials
(1) Dry Ice - If the flight compartment temperature is greater than 73°F (23°C).
B. References
(1)
AMM 24-22-00/201, Manual Control
(2)
AMM 32-09-02/201, Air/Ground Relay System
(3)
IPC 21-41-52 Fig. 1
C. Access
(1) Location Zones
221 Control Cabin, LH
222 Control Cabin, RH
D. Procedure
S 424-004
(1) Install the flight crew foot heater:
(a)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 1(141)