• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:15来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Put the electrical connector into the hole in the floor.

 (b)  
Attach the heater to the mounting brackets with the 12 screws.

 (c)  
Connect the electrical connector in the ceiling space of the main deck cabin. 1) Captain's foot heaters, DH519-left and DH520-right.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-42-01
 ALL  ú ú 03 Page 402 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 

Flight Crew Foot Heater Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-42-01
 ALL  ú ú 01 Page 403 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 2)  First officer's foot heater, DH521-left and DH522-right.
 (2)  S 864-016For the captain's foot heaters, remove the DO-NOT-CLOSE tags and close these circuit breakers: (a) P414 Power Distribution Center - Left 1) 414H10 AUX HEAT PWR CAPT HIGH 2) 414H11 AUX HEAT PWR CAPT LOW
 (3)  S 864-017For the first officer's foot heaters, remove the DO-NOT-CLOSE tags and close these circuit breakers: (a) P414 Power Distribution Center - Left 1) 414H12 AUX HEAT PWR F/O HIGH 2) 414H13 AUX HEAT PWR F/O LOW
 (4)  S 864-005Apply electrical power (AMM 24-22-00/201).
 S 844-018

 WARNING: YOU MUST CAREFULLY FOLLOW THE STEPS IN THE SPECIFIED TASK TO
_______ PREPARE THE SAFETY SENSITIVE SYSTEMS FOR THE AIR MODE. FAILURE TO FOLLOW THE STEPS CORRECTLY CAN CAUSE THE AUTOMATIC OPERATION OF THE AIRPLANE SYSTEMS. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
 (5)  
Do the "Prepare Safety-Sensitive Systems for Air Mode Simulation" task (AMM 32-09-02/201).

 S 864-024

 (6)  
Put the airplane in the AIR mode (AMM 32-09-02/201).

 S 864-020

 (7)  
Close the following circuit breaker for the flight crew foot heater:


 (a)  On the P7 Overhead Circuit Breaker Panel 1) 7F23 LANDING GEAR DSP & CONT ALTN
 S 714-006
 (8)  Do a test of the flight crew foot heaters.
 (a)  
If the temperature in the flight compartment is greater than 73°F (23°C), apply dry ice to the foot heater.

 (b)  
Set the applicable FOOT HEATERS switch to the HI position.

 (c)  
Make sure the heater becomes warm.

 (d)  
Set the applicable FOOT HEATERS switch to OFF.


 S 864-022
 (9)  Open the following circuit breaker for the flight crew foot heater:
 (a)  On the P7 Overhead Circuit Breaker Panel 1) 7F23 LANDING GEAR DSP & CONT ALTN
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-42-01
 ALL  ú ú 04 Page 404 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 844-019
 (10)
 Do the "Put Safety-Sensitive Systems back to the Condition Before Air Mode Simulation" task (AMM 32-09-02/201).

 S 864-008

 (11)
 Remove electrical power (AMM 24-22-00/201).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-42-01
 ALL  ú ú 04 Page 405 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 FLIGHT CREW SHOULDER HEATER - REMOVAL/INSTALLATION
__________________________________________________
 1.  General
_______
 A.  There are two tasks in this procedure. There is one task for the removal and one task for the installation of a flight crew shoulder heater. The procedure includes these steps:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 1(142)