21-26-10
ALL ú ú 01F Page 403 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 434-046
(3)
Instal the nuts, bolts, and washers on the lug at the aft end of the fan.
S 434-047
(4)
Install the nuts, bolts, and washers on the lug at the forward end of the fan.
S 434-031
(5)
Pull the flex duct over the outboard end of the fan.
S 434-050
(6)
Put the inlet screen/check valve assembly with the rubber sleeve in its position and install the fan inlet clamp.
S 434-051
(7)
Install the clamps on both ends of the fan.
S 434-032
(8)
Install the electrical connector on the fan:
(a)
DB8643 (Forward Fan)
(b)
DB8642 (Aft Fan)
S 864-034
(9) Remove the DO-NOT-CLOSE identifiers and close these circuit
breakers:
(a)
Overhead Circuit Breaker Panel, P180 1) 180H2, LWR FWD CARGO VENT FAN PWR 1 (Forward Fan) 2) 180H5, LWR FWD CARGO VENT FAN PWR 2 (Aft Fan)
(b)
Left Power Distribution Center, P414
1) 414E10, CARGO VENT FWD CONT
D. Do the Installation Test for the Fan
S 864-035
(1)
Supply electrical power (AMM 24-22-00/201).
(2)
Make sure the forward cargo door is fully open.
S 864-055
(3)
Make sure the cargo air conditioning flow control switch on the overhead P461 panel is set to OFF.
S 864-053
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-26-10
ALL ú ú 02F Page 404 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(4) S 864-056Open, then close this circuit breaker on the main power distribution panel, P6: (a) E34, A/C CONT CARGO - PCA
(5) S 864-057Put the FORWARD CARGO VENT switch on the P86 panel above the cargo door to ON.
(6) S 714-058Make sure the fan operates. (a) Make sure air comes from the ceiling outlets.
(7) S 794-059Examine the fan to duct connections for air leaks. (a) Light leakage is permitted. (b) If the leakage is strong, align the joints and tighten the clamps.
(8) S 864-060Put the FORWARD CARGO VENT switch to OFF.
(9) S 434-039Install the ceiling lining (AMM 25-52-01/401).
S 864-062
(10)
Close the forward cargo door.
S 864-040
(11)
Remove the electrical power if it is not necessary (AMM 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-26-10
ALL ú ú 01F Page 405 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
AFT CARGO VENTILATION FAN - REMOVAL/INSTALLATION
________________________________________________
1. General
_______
A. The aft cargo vent fan is installed on the right-hand side of the aft containerized area at station 1740.
B. To get access to the fan you must remove the compartment sidewall lining.
TASK 21-26-12-004-001
2. Aft Cargo Ventilation Fan Removal (Fig. 401)
_________________________________
A. References
(1)
AMM 25-52-01/401, Containerized Cargo Compartment Ceiling and Sidewall Linings
(2)
AMM 25-55-02/401, Bulk Compartment Ceiling and Sidewall Lining
(3)
IPC 21-28-51 Fig. 1
(4)
WDM 21-27-21
(5)
SSM 21-27-02
B. Access
(1) Location Zone
142 Aft Lower Lobe Compartment, RH
C. Prepare for the Removal
S 864-030
(1)
Make sure that the AFT CARGO VENT switch on the P59 panel just forward of the cargo door is set to OFF.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 1(68)