PANEL
Emergency Exit Hatch Lining
Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-21-12
ALL ú ú B01 Page 403 ú Jul 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A56121
A
737-300/400/500MAINTENANCE MANUAL
RELEASE HANDLE SEE A
LIFT HANDLE
HATCH
A
SHIM COVER
SCREW
EMERGENCY EXIT (3 LOCATIONS) INSERT
HATCH
CLAMP
HANDLE FRAME RELEASE HANDLE CLAMP
COVER HANDLE
HATCH
WASHER A
(3 LOCATIONS)
RELEASE HANDLE
FWD RELEASE HANDLE
A 1 A-A 1
HATCH
RELEASE HANDLE HATCH
B BRACKET (2 LOCATIONS) COVER
RELEASE HANDLE
RELEASE BRACKET
HANDLE (2 LOCATIONS)COVER
LANYARD
FWD B
RELEASE HANDLE
A2 B-B 2
1 HANDLE COVER ATTACHED WITH THREE SCREWS 2 HANDLE COVER ATTACHED WITH BRACKETS
Release Handle Assembly Figure 402 (Sheet 1)
A56955
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-21-12
ALL ú ú B02 Page 404 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
HATCH HANDLE RELEASE SCREW (2 LOCATIONS) SHELL ASSEMBLY HATCH
C COVER
SPRING SPRING
SHELL ASSEMBLY POST FWD RELEASE HANDLE COVER POST
C RELEASE HANDLE
RELEASE HANDLE
A 3 C-C 3
3 HANDLE COVER ATTACHED WITH TWO SCREWS
Release Handle Assembly Figure 402 (Sheet 2)
F90427
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-21-12
ALL ú ú B08 Page 405 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
(b)
Remove the hatch seal.
(c)
Remove the panel from the hatch frame.
S 034-013-B00
(6) Remove the hatch insallation.
TASK 52-21-12-404-008-B00
3. Emergency Exit Hatch Lining Installation________________________________________
A. References
(1)
AMM 52-21-00/401, Emergency Exit Hatch
B.
Access
(1)
Location Zone
116 Right Emergency Exit Hatch
117 Left Emergency Exit Hatch
C.
Procedure
S 214-017-B00
(1)
Make sure the insullation is installed in the hatch frame.
S 424-009-B00
(2)
Install the panel on the hatch structure.
(a)
Put the panel in the correct position on the hatch.
(b)
Install the lift handle assembly.
1) Install the fasteners that hold the lift handle assembly to the structure.
(c)
Install the seal around the edge of the hatch.
(d)
Install the fasteners that hold the panel and the seal to the hatch structure.
(3)
Install the cover for the release handle.
(4)
Install the hatch (AMM 52-21-00/401).
S 434-010-B00
S 414-011-B00
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-21-12
ALL ú ú B01 Page 406 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 舱门 DOORS 1(96)