• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:06来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_______ REMOVED TEMPORARILY. PUT EACH PIPE OR UNIT IN A SEALED VINYL BAG.
 Subtask 35-22-54-860-051
 A. Obey the special precautions when you do this task (Ref. TASK 35-00-00-860-001).
 Subtask 35-22-54-020-050
 B. Removal of the Emergency Oxygen Containers in the Passenger Service
 Channels
 (Ref. Fig. 401/TASK 35-22-54-991-001, 402/TASK 35-22-54-991-006)

 (1)
 Release the bayonet lock (4) and remove the hose (3) from the emergency oxygen container (5).

 (2)
 Put PLUG - BLANKING on the disconnected line ends.

 (3)
 Put the disconnected line ends into a sealed BAG - VINYL.

 (4)
 Remove the hose section (6) from the rail (7).

 (5)
 Disengage and lower the inboard side of the aft PSU/filler panel from the emergency oxygen container (5).

 (6)
 Remove the hose section (2) from the rail (1).

 (7)
 Remove the emergency oxygen container (5).

 


 Emergency Oxygen Container in the PSU
 Figure 401/TASK 35-22-54-991-001
 EFF :  401-499,  35-22-54 Page 404 
Aug 01/05
 CES 

 

 Installation Position of the Emergency Oxygen Container
 Figure 402/TASK 35-22-54-991-006

 CES  Subtask 35-22-54-020-051


 C. Removal of the Emergency Oxygen Containers in the Aft Utility Area
 (5030WR and 5033WR)
 (Ref. Fig. 402/TASK 35-22-54-991-006, 403/TASK 35-22-54-991-002)

 (1)
 Release the bayonet lock (4) and remove the hose (3) from the emergency oxygen container (5).

 (2)
 Put PLUG - BLANKING on the disconnected line ends.

 (3)
 Put the disconnected line ends into a sealed BAG - VINYL.

 (4)
 Remove the hose section (6) from the rail (7).

 (5)
 Disengage and lower the inboard side of the aft PSU/filler panel from the emergency oxygen container (5).

 (6)
 Remove the hose section (2) from the rail (1).


 (7) Remove the emergency oxygen container (5). Subtask 35-22-54-020-052
 D. Removal of the Emergency Oxygen Containers in the Lavatory D/E (5031WR and 5034WR) (Ref. Fig. 402/TASK 35-22-54-991-006, 404/TASK 35-22-54-991-003)
 (1)
 Remove the caps (4), the screws (3) and open the access cover (5).

 (2)
 Release the bayonet lock (7) and remove the hose (6) from the emergency oxygen container (8).

 (3)
 Put PLUG - BLANKING on the disconnected line ends.

 (4)
 Put the disconnected line ends into a sealed BAG - VINYL.

 (5)
 Remove the screws (1), the washers (2) and the emergency oxygen container (5).

 


 Emergency Oxygen Container in the High Ceiling Area
 Figure 403/TASK 35-22-54-991-002

 CES


 Emergency Oxygen Container in the Lavatory
 Figure 404/TASK 35-22-54-991-003

 CES  Subtask 35-22-54-020-053


 E. Removal of the Emergency Oxygen Containers in the Lavatory A (5029WR) (Ref. Fig. 402/TASK 35-22-54-991-006, 405/TASK 35-22-54-991-004)
 (1)
 Remove the caps (1) and the screws (2).

 (2)
 Remove the screws (9) and the panel (3).

 (3)
 Release the bayonet lock (7) and remove the hose (4) from the emergency oxygen container (8).

 (4)
 Put PLUG - BLANKING on the disconnected line ends.

 (5)
 Put the disconnected line ends into a sealed BAG - VINYL.

 (6)
 Remove the screws (6), the washers (5) and the emergency oxygen container (8).


 Subtask 35-22-54-020-054
 F. Removal of the Emergency Oxygen Containers 5028WR, 5036WR and 5040WR in the Door Frame Lining (Ref. Fig. 402/TASK 35-22-54-991-006, 406/TASK 35-22-54-991-005)
 (1)
 Release the bayonet lock (1) and remove the hose (5) from the emergency oxygen container (2).

 (2)
 Put PLUG - BLANKING on the disconnected line ends.

 (3)
 Put the disconnected line ends into a sealed BAG - VINYL.

 (4)
 Remove the screws (4), the washers (3) and the emergency oxygen container (2).

 


 Emergency Oxygen Container in the Lavatory A
 Figure 405/TASK 35-22-54-991-004

 CES


 Emergency Oxygen Container in the Door
 Figure 406/TASK 35-22-54-991-005
 EFF :  401-499,  35-22-54 Page 411 
Aug 01/05
 CES 

 

 TASK 35-22-54-400-001
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM OXYGEN 氧气(87)