35-10-00Page 501
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 05-004 USA MIL-L-25567 TYPE I
OXYGEN LEAK DETECTOR (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
3 seal 35-12-01 01 -010 R
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
35-10-00-991-001 Fig. 501
35-10-00-991-002 Fig. 502
3. Job Set-up
__________
Subtask 35-10-00-010-054
A. Get Access
(1)
Put the access platform in position at the access door 812.
(2)
Open the access door 812.
EFF : ALL
35-10-00Page 502
Subtask 35-10-00-865-050
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU OXYGEN/CREW/OXY/SPLY 1HT HA01
Subtask 35-10-00-860-050
C. Aircraft Maintenance Configuration
(Ref. Fig. 501/TASK 35-10-00-991-001)
(1)
Close the valve of the oxygen storage cylinder (5750HM).
(2)
Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
(3)
Make sure that the avionics equipment ventilation operates correctly.
(4)
Bleed the oxygen system:
(a)
On the panel 21VU, release the OXYGEN/CREW SUPPLY pushbutton switch (the OFF legend comes on).
(b)
On one of the oxygen-mask stowage boxes: Push the PRESS TO TEST AND RESET control slide a sufficient number of times to make the system empty.
(5)
In the L Electronics Rack
(a)
Disconnect the LP hose (4) 5762HM.
(b)
Put a blanking cap on the end of the disconnected hose (4).
(c)
Put the end of the hose (4) in a sealed vinyl bag.
(d)
Remove the blanking cap supplied for the test from the oxygen stowage bag (5). Make sure that the seal is on this blanking cap.
(e)
Install and tighten this blanking cap on the port (2) of the oxygen regulator (1).
EFF : ALL
35-10-00Page 503
Preparation for the Test
Figure 501/TASK 35-10-00-991-001
EFF : ALL 35-10-00 Page 504
Feb 01/98
CES
Subtask 35-10-00-480-050
D. Preparation of the Test Installation
(Ref. Fig. 502/TASK 35-10-00-991-002)
(1)
Get a nitrogen source.
中国航空网 www.aero.cn