EFF : ALL
25-54-12Page 808
May 01/05
Subtask 25-54-12-410-055-A
B. Close Access
(1)
Remove the access platform(s).
(2)
Remove the actuator safety lock and close the FWD cargo-compartment door (Ref. TASK 52-30-00-860-002).
(3)
Remove the warning notice(s).
(4)
Make sure that the work area is clean and clear of tool(s) and other items.
R **ON A/C 051-099, 106-149, 151-199, 201-299, 301-399, 401-499,
Subtask 25-54-12-410-055
B. Close Access
(1)
Remove the access platform(s).
(2)
Remove the actuator safety lock and close the FWD cargo-compartment door (Ref. TASK 52-30-00-860-002).
(3)
Make sure that the work area is clean and clear of tool(s) and other items.
EFF : ALL
25-54-12Page 809
STANCHION - DOOR NET - REMOVAL/INSTALLATION
___________________________________________
TASK 25-54-17-000-001 Removal of the Net Stanchions in the FWD Cargo Compartment
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 2M (6 FT)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 25-54-17-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-54-17-010-050
A. Get Access
(1)
Open the FWD cargo-compartment door and install the actuator safety lock (Ref. TASK 52-30-00-860-001).
(2)
Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the FWD cargo-compartment door.
EFF : ALL
25-54-17Page 401
4. Procedure
_________ Subtask 25-54-17-020-050
A. Removal of the Net Stanchions
(Ref. Fig. 401/TASK 25-54-17-991-001)
(1)
Disconnect the net fittings from the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
(2)
Remove the stanchions (2). NOTE : The removal procedure for all the stanchions (2) is the same.
____ Thus, the removal procedure for one stanchion (2) only is given here.
(a)
Turn the locking base (3) counterclockwise to unlock the stanchion from the tiedown point (4).
(b)
Push the stanchion (2) up to release the stanchion locking base
(3) from the tiedown point (4).
(c)
Move the lower part of the stanchion (2) away from the tiedown point (4). Then move the stanchion (2) down to remove the stanchion plunger from the upper ceiling fitting (1).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备4(9)