(b)
Put the tie-down point (8) in position at the plug housing (9).
(c)
Install the screws (7) and the nuts (10).
(3) Install the tie-down fittings (12): NOTE : The installation procedure for all the tie-down fittings (12)
____ is the same. Therefore, the installation procedure for one tie-down fitting (12) only is given here.
(a)
Put the tie-down fitting (12) in position at the structure (3).
(b)
Install the screws (11) and the nuts (13).
(4) Install the seat-track sections (15): NOTE : The installation procedure for all the seat-track sections
____ (15) is the same. Therefore, the installation procedure for one seat-track section (15) only is given here.
(a)
Put the seat-track section (15) in position at the structure (3).
(b)
Install the screws (14) and the nuts (16).
(5)
Install the tie-down fitting (18):
(a)
Put the tie-down fitting (18) in position at the structure (3).
(b)
Install the screws (17) and the nuts (19).
(6)
Install the tie-down fittings (21): NOTE : The installation procedure for all the tie-down fittings (21)
____ is the same. Therefore, the installation procedure for one tie-down fitting (21) only is given here.
(a)
Put the tie-down fitting (21) in position at the structure (3).
(b)
Install the screws (20) and the nuts (22).
(7)
Install the tie-down fitting (24):
(a)
Put the tie-down fitting (24) in position at the structure (3).
(b)
Install the screws (23) and the nuts (25).
(8)
Install the tie-down fitting (27):
(a)
Put the tie-down fitting (27) in position at the structure (3).
(b)
Install the screws (26) and the nuts (28).
(9)
Install the cargo net(s) (5), if removed:
(a)
Put the cargo net(s) (5) in position at the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
(b)
Connect the net fittings (6) to the net attachment fittings.
(c)
Install the screws (7) and the nuts (10).
(3)
Install the tie-down fittings (12): NOTE : The installation procedure for all the tie-down fittings (12)
R **ON A/C 151-199, 201-202, 301-399, 401-499,
Subtask 25-55-41-420-052-A
D. Installation of the Tie-Down and Net Attachment Fittings in the Floor Area of the BULK Cargo-Compartment
**ON A/C 151-199,
(Ref. Fig. 403A/TASK 25-55-41-991-003-B)
**ON A/C 201-202, 301-399,
(Ref. Fig. 403B/TASK 25-55-41-991-003-A)
R **ON A/C 401-499,
R (Ref. Fig. 403C/TASK 25-55-41-991-003-C)
R **ON A/C 151-199, 201-202, 301-399, 401-499,
(1) Install the tie-down points (2):
NOTE : The installation procedure for all the tie-down points (2) is____ the same. Therefore, the installation procedure for one tie-down point (2) only is given here.
(a) Put the tie-down point (2) in position at the structure (3).
(b) Install the screws (1) and the nuts (4).
(2) Install the tie-down points (8):
NOTE : The installation procedure for all the tie-down points (8) is____ the same. Therefore, the installation procedure for one tie-down point (8) only is given here.
(a) Put the plug housing (9) in position at the structure (3), if removed.
(b) Put the tie-down point (8) in position at the plug housing (9).
____ is the same. Therefore, the installation procedure for one tie-down fitting (12) only is given here.
(a)
Put the tie-down fitting (12) in position at the structure (3).
(b)
Install the screws (11) and the nuts (13).
(4) Install the cargo net(s) (5), if removed:
(a) Put the cargo net(s) (5) in position at the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
(b) Connect the net fittings (6) to the net attachment fittings. **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
Subtask 25-55-41-420-053
E. Installation of the Tie-Down and Net Attachment Fittings in the Ceiling Area of the BULK Cargo-Compartment (Ref. Fig. 404/TASK 25-55-41-991-004)
(1) Install the tie-down points (3): NOTE : The installation procedure for all the tie-down points (3) is
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备4(53)