EFF : ALL
25-55-12Page 421
R R Ceiling Panels - AFT Cargo Compartment FR59/FR65 Figure 402B/TASK 25-55-12-991-002-B
R EFF : 401-499, 25-55-12 Page 422 Aug 01/05
CES
TASK 25-55-12-400-002 Installation of the Ceiling Panels in the AFT Cargo Compartment - FR59/FR65
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2.1 m (6 ft. 11 in.) No specific access platform 3.5 m (11 ft. 6 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-68-41-960-001 Replacement of the Decompression Panels 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
25-55-12-991-002 Fig. 402
EFF : ALL
25-55-12Page 423
Aug 01/05
R
CES -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 151-199,
25-55-12-991-002-A Fig. 402A R **ON A/C 401-499,
R 25-55-12-991-002-B Fig. 402B **ON A/C ALL
3. Job Set-up
__________
**ON A/C 001-049, 051-099, 101-105,
Subtask 25-55-12-860-051-B
A. Aircraft Maintenance Configuration
(1)
Make sure that the BULK cargo-compartment door is opened
(2)
Make sure that the access platform in position below the opened cargo door.
R **ON A/C 106-149, 151-199, 201-299, 301-399, 401-499,
Subtask 25-55-12-860-051-A
A. Aircraft Maintenance Configuration
(1)
Make sure that the AFT cargo-compartment door is opened and safetied with the actuator safety locks (Ref. TASK 52-30-00-860-001).
(2)
Make sure that the access platform is in position at the opening of the AFT cargo compartment door.
EFF : ALL
25-55-12Page 424
**ON A/C ALL
4. Procedure
_________
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
(Ref. Fig. 402/TASK 25-55-12-991-002)
**ON A/C 151-199,
(Ref. Fig. 402A/TASK 25-55-12-991-002-A) R **ON A/C 401-499,
R (Ref. Fig. 402B/TASK 25-55-12-991-002-B) **ON A/C ALL
Subtask 25-55-12-910-051
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
If necessary, remove damaged tape (1) from the ceiling panels (2).
(4)
Clean the component interface and/or the adjacent area with CLEANING AGENTS (Material No. 11-004).
(5)
Replace the removed tape (1) on the ceiling panels (2).
(6)
Check the decompression panels as follows:
(a)
Make sure that each decompression panel is in the correct position.
(b)
Make sure that each decompression panel is in the correct condition.
EFF : ALL
25-55-12Page 425
(c) Make sure that the seal of each decompression panel is in the correct condition.
(7) If necessary, replace the applicable decompression panel(s) and/or the seal(s) (Ref. TASK 25-68-41-960-001).
Subtask 25-55-12-420-051
B. Install the Ceiling Panels from FR59 thru FR65
NOTE : The installation of each ceiling panel is the same.
____
(1)
Put the ceiling panels (2) in the correct installation position on the aircraft structure.
(2)
Secure the ceiling panels (2) with the studs (3),(4) and (7).