• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:32来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Carefully remove the RCP (1) until you can get access to the electrical connector (4).

 (3)
 Disconnect the electrical connector (4) and remove the RCP (1).

 (4)
 Put blanking caps on the disconnected electrical connectors.

 


 RCP 111MX Figure 401/TASK 25-65-18-991-001 
R  EFF :  151-199, 211-228, 301-302,  25-65-18 Page 403 Feb 01/05
 CES 

 

 TASK 25-65-18-400-001 Remote-Control Panel (RCP) 111MX (Emergency Locator Transmitter) - Installation
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 25-65-00-740-001 Emergency Locator Transmitter (ELT) System - BITE Test 25-65-18-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 25-65-18-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
 4. Procedure
_________ Subtask 25-65-18-420-050
 A. Installation of the RCP 111MX
 (Ref. Fig. 401/TASK 25-65-18-991-001)

 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Remove the blanking caps from the electrical connectors.

 (4)
 Make sure that the electrical connectors are clean and in the correct


 condition.


 (5)
 Put the RCP (1) in position and connect the electrical connector (4).

 


 (6) Carefully install the RCP (1) and tighten the captive screws (3). Subtask 25-65-18-740-050
 B. Do the BITE test (Ref. TASK 25-65-00-740-001).
 5. Close-up
________ Subtask 25-65-18-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 Subtask 25-65-18-862-050
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 

 TRANSMITTER - EMERGENCY LOCATOR, AIRCRAFT (110MX) - REMOVAL/INSTALLATION
________________________________________________________________________ TASK 25-65-35-000-001 Removal of the Emergency Locator Transmitter (ELT) 110MX
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific 1 SCRAPER - NON METALLIC
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power 25-23-42-000-002 Removal of the Ceiling Panels - Aft Utility Area 25-65-35-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 25-65-35-861-050
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 25-65-35-010-051
 B. Get access to the ELT 110MX
 (1) Remove the ceiling panel 261BC (Ref. TASK 25-23-42-000-002).


 4. Procedure
_________ Subtask 25-65-35-020-050
 A. Removal of the ELT 110MX (Ref. Fig. 401/TASK 25-65-35-991-001)
 (1)
 Set the ON/OFF/ARM switch (10) to the OFF position.

 (2)
 Use a SCRAPER - NON METALLIC to remove the material (14) from:

 -
The electrical connector (8), or the programming dongle (19) (if installed).

 -
The RCP connector (12).

 

 (3)
 Disconnect the antenna connector (9) from the ANT connector (11).

 (4)
 Disconnect the electrical connector (8) or programming-dongle (19) (if installed) from the RCP connector (12).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备4(160)