• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:32来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

____ the same. Therefore, the installation procedure for one tie-down point (3) only is given here.
 (a) Install the spacer (2), if removed: 1 Put the spacer (2) in position at the structure (1).
_
 2 Install the screws (5) in the spacer (2).

_

 (b)
 Put the tie-down point (3) in position at the spacer (2).

 (c)
 Install the screws (4) in the tie-down point (3).


R  EFF : 001-049, 051-099, 101-149, 151-199, 25-55-41Page 457 201-202, 221-221, 224-224, 228-228, 301-399, Aug 01/05 401-499, CES  CES R **ON A/C 151-199, 401-499,


 (2) Install the tie-down points (6):
 NOTE : The installation procedure for all the tie-down points (6) is____ the same. Therefore, the installation procedure for one tie-down point (6) only is given here.
 (a) Put the tie-down point (6) in position at the structure (1).
 (b) Install the screws (7) in the tie-down point (6).
 (3) Install the stanchion fittings (10):
 NOTE : The installation procedure for all the stanchion fittings (10)____ is the same. Therefore, the installation procedure for one stanchion fitting (10) only is given here.
 (a) Put the stanchion fitting (10) in position at the structure (1).
 (b) Install the screws (11) in the stanchion fitting (10).
 (4) Install the cargo net(s) (9), if removed:
 (a) Put the cargo net(s) (9) in position at the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
 (b) Connect the net fittings (8) to the net attachment fittings. 
R  **ON A/C 151-199, 401-499,
 Subtask 25-55-41-420-053-B
 E. Installation of the Tie-Down and Net Attachment Fittings in the Ceiling Area of the BULK Cargo-Compartment 
R  **ON A/C 151-199,
 (Ref. Fig. 404A/TASK 25-55-41-991-004-B) 
R  **ON A/C 401-499, 
R  (Ref. Fig. 404C/TASK 25-55-41-991-004-C) 

 

 (1) Install the tie-down points (3): NOTE : The installation procedure for all the tie-down points (3) is
____ the same. Therefore, the installation procedure for one tie-down point (3) only is given here.
 (a) Install the spacer (2), if removed: 1 Put the spacer (2) in position at the structure (1).
_
 2 Install the screws (5) in the spacer (2).

_

 (b)
 Put the tie-down point (3) in position at the spacer (2).

 (c)
 Install the screws (4) in the tie-down point (3).


 (2) Install the tie-down points (6): NOTE : The installation procedure for all the tie-down points (6) is
____ the same. Therefore, the installation procedure for one tie-down point (6) only is given here.
 (a)
 Put the tie-down point (6) in position at the structure (1).

 (b)
 Install the screws (7) in the tie-down point (6).


 (3) Install the cargo net(s) (9), if removed:
 (a)
 Put the cargo net(s) (9) in position at the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.

 (b)
 Connect the net fittings (8) to the net attachment fittings.

 


 **ON A/C 201-220, 222-223, 225-227, 229-299, 301-399,
 Subtask 25-55-41-420-053-A
 E. Installation of the Tie-Down and Net Attachment Fittings in the Ceiling Area of the BULK Cargo-Compartment
 **ON A/C 203-220, 222-223, 225-227, 229-299,
 (Ref. Fig. 404/TASK 25-55-41-991-004) **ON A/C 201-202, 301-399,
 (Ref. Fig. 404B/TASK 25-55-41-991-004-A) **ON A/C 201-220, 222-223, 225-227, 229-299, 301-399,
 (1) Install the tie-down points (3): NOTE : The installation procedure for all the tie-down points (3) is
____ the same. Therefore, the installation procedure for one tie-down point (3) only is given here.
 (a) Install the spacer (2), if removed: 1 Put the spacer (2) in position at the structure (1).
_
 2 Install the screws (5) in the spacer (2).

_

 (b)
 Put the tie-down point (3) in position at the spacer (2).

 (c)
 Install the screws (4) in the tie-down point (3).


 (2) Install the tie-down points (6): NOTE : The installation procedure for all the tie-down points (6) is
____ the same. Therefore, the installation procedure for one tie-down point (6) only is given here.
 (a)
 Put the tie-down point (6) in position at the structure (1).

 (b)
 Install the screws (7) in the tie-down point (6).


R  EFF : 201-220, 222-223, 225-227, 229-299, 25-55-41Page 460 301-399, Aug 01/05
 CES


 (3) Install the stanchion fittings (10): NOTE : The installation procedure for all the stanchion fittings (10)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备4(54)