1_ Loosen the nuts (40) and (41) to adjust the support bracket
(8).
2_ Move the support bracket (8) in a FWD or an AFT direction,
until the tension is released.
3_ Tighten the nuts (40) and (41).
_ the nut (33).
R EFF : 001-049, 051-099, 101-149, 151-199, 25-62-46Page 417 201-299, 401-499, Aug 01/05
CES
NOTE : When you loosen the nut (33) the torsion is
____ automatically released. The nut (33) at the pulley assembly (7) is installed with loctite.
2 Torque the nut (33) to between 0.7 and 0.8 m.daN (61.94 and
_
70.79 lbf.in). 3 Safety the nut (33) with lockwire MISCELLANEOUS (Material No.
_
19-010) (34).
(16) Remove the lock pin (12) from the regulator valve assembly (6).
(17) Put the lock pin (12) in the pocket (3). Subtask 25-62-46-865-051
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 153RH, 162RH
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
Subtask 25-62-46-710-052
D. Operational Test of the Inflation Reservoir (Slide-Bottle) monitoring, through the Cabin Intercommunication Data System (CIDS) (Ref. Fig. 401/TASK 25-62-46-991-001, 402/TASK 25-62-46-991-003)
NOTE : This test is applicable only if the Cabin Assignment Module (CAM)
____
is programmed to monitor the slide-bottles.
(1) Energize the CIDS (Ref. TASK 23-73-00-861-001).
NOTE : Two persons are necessary to do the test.
____
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. At the FWD ATTND station:
-Open the access door to the
programming and test panel
(PTP), 110RH.
2. At the PTP, 110RH: On the PTP display screen:
R EFF : 001-049, 051-099, 101-149, 151-199, 25-62-46Page 418 201-299, 401-499, Aug 01/05
CES
Pressure Indication Test through CIDS Figure 402/TASK 25-62-46-991-003
R EFF : 001-049, 051-099, 101-105, 151-199, 201-299, 25-62-46 Page 419 May 01/05
CES
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
NOTE : You can ignore other
____ maintenance messages, if they are shown.
-
Push the DSPL ON pushbutton switch.
-
Push the SYSTEM STATUS line selection-key.
3. At the inflation reservoir (5):
-Disconnect the connector (21): FOR 7506MM 7555VC-A. FOR 7507MM 7556VC-A.
4. At the PTP, 110RH:
-Push the line selection-key next to the message SLIDES PRESS LOW.
5. At the inflation reservoir (5):
-Connect the connector (21): FOR 7506MM 7555VC-A. FOR 7507MM 7556VC-A.
6. At the PTP, 110RH:
-
The main menu page shows.
-
The SYSTEM STATUS page shows themessage SLIDES PRESS OK.
NOTE : If the message SLIDES PRESS OK
____ does not show, push the CONT line selection-key until the message shows.
-After approximately 3 minutes theSYSTEM STATUS page shows the messageSLIDES PRESS LOW.
-
The message CHECK SLIDE PRESS showson the first line.
-
The applicable emergency exit location shows on the next line: FOR 7506MM EMER L. FOR 7507MM EMER R.
-After approximately 3 minutes theSYSTEM STATUS page shows the messageSLIDES PRESS OK.
R EFF : 001-049, 051-099, 101-105, 151-199, 25-62-46Page 420 201-299, May 01/05
CES
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------- Push the DSPL ON pushbutton - The main menu page shows. switch. NOTE : The display screen switches off____ automatically after 10 minutes.
- Close the access door.
R **ON A/C 106-149, 301-399, 401-499,
Subtask 25-62-46-710-052-A
D. Operational Test of the Inflation Reservoir (Slide-Bottle) monitoring, through the Cabin Intercommunication Data System (CIDS)
R **ON A/C 106-149, 401-499,
(Ref. Fig. 401/TASK 25-62-46-991-001)
R **ON A/C 106-149, 301-399, 401-499,
(Ref. Fig. 402A/TASK 25-62-46-991-003-A)
NOTE : This test is applicable only if the Cabin Assignment Module (CAM)____ is programmed to monitor the slide-bottles.
(1) Energize the CIDS (Ref. TASK 23-73-00-861-001).
NOTE : Two persons are necessary to do the test.____