(b)
Remove the cargo net(s) (1).
R EFF : 001-049, 051-099, 101-149, 151-199, 25-54-41Page 405 201-299, 401-499, Aug 01/05
CES
Tie-Down and Net Attachment Fittings - FWD Cargo-Compartment Floor Area Figure 401A/TASK 25-54-41-991-001-A
R EFF : 151-199, 401-499, 25-54-41Page 406 Aug 01/05
CES
(2) Remove the tie-down points (4): NOTE : The removal procedure for all the tie-down points (4) is the
____ same. Therefore, the removal procedure for one tie-down point
(4) only is given here.
(a)
Remove the screws (3) from the tie-down point (4).
(b)
Remove the tie-down point (4) from the plug housing (5).
(c)
If necessary, remove the plug housing (5) from the structure (6).
(3) Remove the tie-down points (8): NOTE : The removal procedure for all the tie-down points (8) is the
____ same. Therefore, the removal procedure for one tie-down point
(8) only is given here.
(a)
Remove the screws (7) from the tie-down point (8).
(b)
Remove the tie-down point (8) from the structure (6).
(4)
Remove the seat-track section (10):
(a)
Remove the screws (9) from the seat-track section (10).
(b)
Remove the seat-track section (10) from the structure (6).
(5)
Remove the tie-down fitting (12):
(a)
Remove the screws (11) from the tie-down fitting (12).
(b)
Remove the tie-down fitting (12) from the structure (6).
(6)
Remove the tie-down fittings (14): NOTE : The removal procedure for all the tie-down fittings (14) is
____ the same. Therefore, the removal procedure for one tie-down fitting (14) only is given here.
(a)
Remove the screws (13) from the tie-down fitting (14).
(b)
Remove the tie-down fitting (14) from the structure (6).
(7) Remove the tie-down fittings (16): NOTE : The removal procedure for all the tie-down fittings (16) is
____ the same. Therefore, the removal procedure for one tie-down fitting (16) only is given here.
(a) Remove the screws (15) from the tie-down fitting (16).
(b) Remove the tie-down fitting (16) from the structure (6). **ON A/C 301-399,
Subtask 25-54-41-020-050-B
A. Removal of the Tie-Down and Net Attachment Fittings from the Floor Area (Ref. Fig. 401B/TASK 25-54-41-991-001-B)
(1)
Remove the cargo net(s) (7), if installed:
(a)
Disconnect the net fittings (8) from the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
(b)
Remove the cargo net(s) (7).
(2)
Remove the tie-down points (2): NOTE : The removal procedure for all the tie-down points (2) is the
____ same. Therefore, the removal procedure for one tie-down point
(2) only is given here.
(a)
For the tie-down points (2) installed between FR35 and FR35.4: 1 Remove the nuts (4), and remove the screws (1) from the
_
tie-down point (2).
(b)
For the tie-down points (2) installed at all other frame positions:
1 Remove the screws (1) from the tie-down point (2).
_
(c) Remove the tie-down point (2) from the structure (3).
R Tie-Down and Net Attachment Fittings - FWD Cargo-Compartment Floor Area
R Figure 401B/TASK 25-54-41-991-001-B
R EFF : 301-399, 25-54-41 Page 409
May 01/04
CES
R (3) Remove the seat-track section (6):
R (a) Remove the screws (5) from the seat-track section (6).
R (b) Remove the seat-track section (6) from the structure (3).
R (4) Remove the tie-down points (10):
R NOTE : The removal procedure for all the tie-down points (10) is the____
R same. Therefore, the removal procedure for one tie-down point
R (10) only is given here.
R (a) For the tie-down points (10) installed between FR35 and FR35.4:
R 1_ Remove the nuts (12), and remove the screws (9) from the
R tie-down point (10).
R (b) For the tie-down points (10) installed at all other frame
R positions:
R 1_ Remove the screws (9) from the tie-down point (10).
R (c) Remove the tie-down point (10) from the plug housing (11).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备4(12)