 (b)
 Remove the cargo net(s) (1).


R  EFF : 001-049, 051-099, 101-149, 151-199, 25-54-41Page 405 201-299, 401-499, Aug 01/05
 CES


 Tie-Down and Net Attachment Fittings - FWD Cargo-Compartment Floor Area Figure 401A/TASK 25-54-41-991-001-A
R EFF : 151-199, 401-499, 25-54-41Page 406 Aug 01/05
 CES


 (2) Remove the tie-down points (4): NOTE : The removal procedure for all the tie-down points (4) is the
____ same. Therefore, the removal procedure for one tie-down point
 (4) only is given here.
 (a)
 Remove the screws (3) from the tie-down point (4).

 (b)
 Remove the tie-down point (4) from the plug housing (5).

 (c)
 If necessary, remove the plug housing (5) from the structure (6).


 (3) Remove the tie-down points (8): NOTE : The removal procedure for all the tie-down points (8) is the
____ same. Therefore, the removal procedure for one tie-down point
 (8) only is given here.
 (a)
 Remove the screws (7) from the tie-down point (8).

 (b)
 Remove the tie-down point (8) from the structure (6).


 (4)
 Remove the seat-track section (10):

 (a)
 Remove the screws (9) from the seat-track section (10).

 (b)
 Remove the seat-track section (10) from the structure (6).

 

 (5)
 Remove the tie-down fitting (12):

 (a)
 Remove the screws (11) from the tie-down fitting (12).

 (b)
 Remove the tie-down fitting (12) from the structure (6).

 

 (6)
 Remove the tie-down fittings (14): NOTE : The removal procedure for all the tie-down fittings (14) is


____ the same. Therefore, the removal procedure for one tie-down fitting (14) only is given here.
 (a)
 Remove the screws (13) from the tie-down fitting (14).

 (b)
 Remove the tie-down fitting (14) from the structure (6).

 


 (7) Remove the tie-down fittings (16): NOTE : The removal procedure for all the tie-down fittings (16) is
____ the same. Therefore, the removal procedure for one tie-down fitting (16) only is given here.
 (a) Remove the screws (15) from the tie-down fitting (16).
 (b) Remove the tie-down fitting (16) from the structure (6). **ON A/C 301-399,
 Subtask 25-54-41-020-050-B
 A. Removal of the Tie-Down and Net Attachment Fittings from the Floor Area (Ref. Fig. 401B/TASK 25-54-41-991-001-B)
 (1)
 Remove the cargo net(s) (7), if installed:

 (a)
 Disconnect the net fittings (8) from the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.

 (b)
 Remove the cargo net(s) (7).

 

 (2)
 Remove the tie-down points (2): NOTE : The removal procedure for all the tie-down points (2) is the


____ same. Therefore, the removal procedure for one tie-down point
 (2) only is given here.
 (a)
 For the tie-down points (2) installed between FR35 and FR35.4: 1 Remove the nuts (4), and remove the screws (1) from the

_
 tie-down point (2).


 (b)
 For the tie-down points (2) installed at all other frame positions:


 1 Remove the screws (1) from the tie-down point (2).
_
 (c) Remove the tie-down point (2) from the structure (3).


R  Tie-Down and Net Attachment Fittings - FWD Cargo-Compartment Floor Area 
R  Figure 401B/TASK 25-54-41-991-001-B 
R  EFF :  301-399,  25-54-41 Page 409 
May 01/04
 CES 

 

R  (3) Remove the seat-track section (6): 
R  (a) Remove the screws (5) from the seat-track section (6). 
R  (b) Remove the seat-track section (6) from the structure (3). 
R  (4) Remove the tie-down points (10): 
R  NOTE : The removal procedure for all the tie-down points (10) is the____ 
R  same. Therefore, the removal procedure for one tie-down point 
R  (10) only is given here. 
R  (a) For the tie-down points (10) installed between FR35 and FR35.4: 
R  1_  Remove the nuts (12), and remove the screws (9) from the
R  tie-down point (10). 
R  (b) For the tie-down points (10) installed at all other frame 
R  positions: 
R  1_  Remove the screws (9) from the tie-down point (10).
R  (c) Remove the tie-down point (10) from the plug housing (11). 
 