EFF : ALL
25-54-17Page 402
Stanchion - Door Net - FWD Cargo Compartment
Figure 401/TASK 25-54-17-991-001
EFF : ALL 25-54-17 Page 403
May 01/05
CES
TASK 25-54-17-400-001 Installation of the Net Stanchions in the FWD Cargo Compartment
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 2M (6 FT)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 25-54-17-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-54-17-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the FWD cargo-compartment door is open and safetied with the actuator safety lock (Ref. TASK 52-30-00-860-001).
(2)
Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the FWD cargo-compartment door.
EFF : ALL
25-54-17Page 404
4. Procedure
_________ Subtask 25-54-17-910-050
A. Preparation for Installation:
(1)
Do an inspection of the component interface and/or the adjacent area.
(2)
Clean the component interface and/or the adjacent area.
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 25-54-17-420-050
B. Installation of the Net Stanchions.
(Ref. Fig. 401/TASK 25-54-17-991-001)
NOTE : The installation procedure for all the stanchions (2) is the same.
____ Thus, the installation procedure for one stanchion (2) only is given here.
(1)
Make sure that the stanchion locking base (3) is in the unlocked position.
(2)
Carefully insert the stanchion plunger (2) in the upper ceiling fitting (1).
(3)
Push the stanchion (2) up and align the stanchion locking base (3) with the tiedown point (4).
(4)
Carefully lower the stanchion (2).
(5)
Make sure that the stanchion locking base (3) is in the correct position on the tiedown point (4).
(6)
Turn the stanchion locking base (3) clockwise 90 degrees to attach the stanchion (2) to the tiedown point (4).
(7)
Make sure that the stanchion (2) is correctly attached.
(8)
Connect the net fittings to the applicable net attachment fittings as required.
EFF : ALL
25-54-17Page 405
5. Close-up
________ Subtask 25-54-17-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the actuator safety lock and close the FWD cargo-compartment door (Ref. TASK 52-30-00-860-002).
(3)
Remove the access platform(s).
EFF : ALL
25-54-17Page 406
TIE DOWN FITTING AND NETS - FWD - REMOVAL/INSTALLATION
______________________________________________________
TASK 25-54-41-000-001
Removal of the Tie-Down and Net Attachment Fittings of the FWD Cargo-
Compartment
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2.0 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备4(10)