 Install the blanking plug (7) on the enclosure connection (8).


 EFF : ALL
25-62-00Page 413


 Installation of the Enclosure Door Figure 403/TASK 25-62-00-991-014 
R  EFF : 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  25-62-00 Page 414 Aug 01/05
 CES 

 

 **ON A/C ALL
 4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Subtask 25-62-00-040-052
 A. Installation Procedure of the Enclosure Door
 (Ref. Fig. 403/TASK 25-62-00-991-014)

 (1)
 Put the lower edge of the enclosure door (5) in the groove in the bottom of the enclosure (4).

 (2)
 Close the enclosure door (5) on the three ball-lock assemblies (6).

 (3)
 Push the head of the lock pin (10) with a SCREWDRIVER - PHILLIPS HEAD, then:

 -Apply force to the enclosure door (5) adjacent to the lock pin (9).
 -Remove the screwdriver.
 -Continue to push the enclosure door (5) until the lock pin (9) moves quickly back to a flush position with the surface of the enclosure door (5).

 (4)
 Do this procedure with each lock pin (9).


 (5) Make an entry in the logbook to record the procedure.
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,

 Subtask 25-62-00-869-054
 B. System Consequences
 (1) The message 'SLIDE PRESSURE LOW' shows on the programming and test panel (PTP).
 EFF : ALL
25-62-00Page 415


R **ON A/C 106-149, 301-399, 401-499,
 Subtask 25-62-00-869-054-A
 B. System Consequences
 (1) The message 'CHECK SLIDE PRESSURE' shows on the flight attendant panel (FAP).
 **ON A/C ALL
 5. Close-up
________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Subtask 25-62-00-860-065
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000) from the slat/flap control lever.

 (3)
 Remove the warning notice(s).

 (4)
 Remove the access platform(s).


 EFF : ALL
25-62-00Page 416


 TASK 25-62-00-440-005 Reactivation of the Enclosure
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 25-60-02-B)
 Emergency - Escape Slide/Slide Raft
 Overwing Emergency Exit

 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-62-42-000-001 Offwing Escape-Slide - Removal 25-62-42-400-001 Offwing Escape-Slide - Installation 25-62-46-000-001 Inflation Reservoir, Offwing Escape-Slide - Removal 25-62-46-400-001 Inflation Reservoir, Offwing Escape-Slide -
Installation
 3. Job Set-up
__________ Subtask 25-62-00-010-073
 A. Get Access
 (1) There is no special job set-up for this task.
 4. Procedure
_________ Subtask 25-62-00-440-052
 A. Reactivation Procedure
 (1)
 Replace the related inflation reservoir, if discharged (Ref. TASK 25-62-46-000-001) (Ref. TASK 25-62-46-400-001).

 (2)
 Replace the related escape-slide enclosure (Ref. TASK 25-62-42-000-001) (Ref. TASK 25-62-42-400-001).

 (3)
 Make an entry in the logbook to record the reactivation.


R  EFF : 001-049, 051-099, 101-149, 151-199, 25-62-00Page 417 201-299, 401-499, Aug 01/05
 CES  **ON A/C 301-399,


 TASK 25-62-00-040-007 Pre-Flight Installation of the Enclosure Door, when the Escape-Slide is Removed
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 25-60-02-C)
 Emergency - Escape Slide/Slide Raft
 Emergency Exit

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 2M (6 FT) No specific 1 SCREWDRIVER - PHILLIPS HEAD No specific 1 WARNING NOTICE 98D27803000000 1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 