(5)
Install the blanking plug (7) on the enclosure connection (8).
EFF : ALL
25-62-00Page 413
Installation of the Enclosure Door Figure 403/TASK 25-62-00-991-014
R EFF : 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, 25-62-00 Page 414 Aug 01/05
CES
**ON A/C ALL
4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 25-62-00-040-052
A. Installation Procedure of the Enclosure Door
(Ref. Fig. 403/TASK 25-62-00-991-014)
(1)
Put the lower edge of the enclosure door (5) in the groove in the bottom of the enclosure (4).
(2)
Close the enclosure door (5) on the three ball-lock assemblies (6).
(3)
Push the head of the lock pin (10) with a SCREWDRIVER - PHILLIPS HEAD, then:
-Apply force to the enclosure door (5) adjacent to the lock pin (9).
-Remove the screwdriver.
-Continue to push the enclosure door (5) until the lock pin (9) moves quickly back to a flush position with the surface of the enclosure door (5).
(4)
Do this procedure with each lock pin (9).
(5) Make an entry in the logbook to record the procedure.
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
Subtask 25-62-00-869-054
B. System Consequences
(1) The message 'SLIDE PRESSURE LOW' shows on the programming and test panel (PTP).
EFF : ALL
25-62-00Page 415
R **ON A/C 106-149, 301-399, 401-499,
Subtask 25-62-00-869-054-A
B. System Consequences
(1) The message 'CHECK SLIDE PRESSURE' shows on the flight attendant panel (FAP).
**ON A/C ALL
5. Close-up
________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 25-62-00-860-065
A. Aircraft Maintenance Configuration
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000) from the slat/flap control lever.
(3)
Remove the warning notice(s).
(4)
Remove the access platform(s).
EFF : ALL
25-62-00Page 416
TASK 25-62-00-440-005 Reactivation of the Enclosure
1. Reason for the Job
__________________
Refer to the MMEL TASK: 25-60-02-B)
Emergency - Escape Slide/Slide Raft
Overwing Emergency Exit
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-62-42-000-001 Offwing Escape-Slide - Removal 25-62-42-400-001 Offwing Escape-Slide - Installation 25-62-46-000-001 Inflation Reservoir, Offwing Escape-Slide - Removal 25-62-46-400-001 Inflation Reservoir, Offwing Escape-Slide -
Installation
3. Job Set-up
__________ Subtask 25-62-00-010-073
A. Get Access
(1) There is no special job set-up for this task.
4. Procedure
_________ Subtask 25-62-00-440-052
A. Reactivation Procedure
(1)
Replace the related inflation reservoir, if discharged (Ref. TASK 25-62-46-000-001) (Ref. TASK 25-62-46-400-001).
(2)
Replace the related escape-slide enclosure (Ref. TASK 25-62-42-000-001) (Ref. TASK 25-62-42-400-001).
(3)
Make an entry in the logbook to record the reactivation.
R EFF : 001-049, 051-099, 101-149, 151-199, 25-62-00Page 417 201-299, 401-499, Aug 01/05
CES **ON A/C 301-399,
TASK 25-62-00-040-007 Pre-Flight Installation of the Enclosure Door, when the Escape-Slide is Removed
1. Reason for the Job
__________________
Refer to the MMEL TASK: 25-60-02-C)
Emergency - Escape Slide/Slide Raft
Emergency Exit
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 2M (6 FT) No specific 1 SCREWDRIVER - PHILLIPS HEAD No specific 1 WARNING NOTICE 98D27803000000 1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------