(a)
Remove the nuts (31), and remove the screws (29) from the tie-down fitting (30).
(b)
Remove the tie-down fitting (30) from the structure (3).
(11)
Remove the tie-down fitting (33):
(a)
Remove the nuts (34), and remove the screws (32) from the tie-down fitting (33).
(b)
Remove the tie-down fitting (33) from the structure (3).
**ON A/C ALL
Subtask 25-55-41-020-051
B. Removal of the Tie-Down and Net Attachment Fittings from the Ceiling Area of the AFT Cargo-Compartment
**ON A/C 001-049, 051-099, 101-149, 201-299,
(Ref. Fig. 402/TASK 25-55-41-991-002) R **ON A/C 151-199, 401-499,
(Ref. Fig. 402A/TASK 25-55-41-991-002-A)
**ON A/C 301-399,
(Ref. Fig. 402B/TASK 25-55-41-991-002-B)
**ON A/C ALL
(1)
Remove the cargo net(s) (9), if installed:
(a)
Disconnect the net fittings (8) from the tie-down and net attachment fittings of the cargo-compartment floor and ceiling areas.
(b)
Remove the cargo net(s) (9).
(2)
Remove the tie-down points (3): NOTE : The removal procedure for all the tie-down points (3) is the
____ same. Therefore, the removal procedure for one tie-down point
(3) only is given here.
(a)
Remove the screws (4) from the tie-down point (3).
(b)
Remove the tie-down point (3) from the spacer (2).
(c)
If necessary, remove the spacer (2): 1 Remove the screws (5) from the spacer (2).
_
Tie-Down and Net Attachment Fittings - AFT Cargo-Compartment Ceiling Area Figure 402/TASK 25-55-41-991-002
R EFF : 001-049, 051-099, 101-149, 201-299, 25-55-41Page 419 Aug 01/05
CES
Tie-Down and Net Attachment Fittings - AFT Cargo-Compartment Ceiling Area Figure 402A/TASK 25-55-41-991-002-A
R EFF : 151-199, 401-499, 25-55-41Page 420 Aug 01/05
CES
R Tie-Down and Net Attachment Fittings - AFT Cargo-Compartment Ceiling Area
R Figure 402B/TASK 25-55-41-991-002-B
R EFF : 301-399, 25-55-41 Page 421
May 01/04
CES
2 Remove the spacer (2) from the structure (1).
_
(3) Remove the tie-down points (6): NOTE : The removal procedure for all the tie-down points (6) is the
____ same. Therefore, the removal procedure for one tie-down point
(6) only is given here.
(a)
Remove the screws (7) from the tie-down point (6).
(b)
Remove the tie-down point (6) from the structure (1).
(4) Remove the stanchion fittings (10). NOTE : The removal procedure for all the stanchion fittings (10) is
____ the same. Therefore, the removal procedure for one stanchion fitting (10) only is given here.
(a) Remove the screws (11) from the stanchion fitting (10).
(b) Remove the stanchion fitting (10) from the structure (1). **ON A/C 001-049, 051-099, 101-149, 203-299,
Subtask 25-55-41-020-052
C. Removal of the Tie-Down and Net Attachment Fittings from the Floor Area of the BULK Cargo-Compartment
**ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
(Ref. Fig. 403/TASK 25-55-41-991-003) **ON A/C 203-220, 222-223, 225-227, 229-299,
(Ref. Fig. 403B/TASK 25-55-41-991-003-A)
EFF : ALL
25-55-41Page 422
Aug 01/05
R
CES **ON A/C 001-049, 051-099, 101-149, 203-299,
(1)
Remove the cargo net(s) (5), if installed:
(a)
Disconnect the net fittings (6) from the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
(b)
Remove the cargo net(s) (5).
(2)
Remove the tie-down points (2): NOTE : The removal procedure for all the tie-down points (2) is the
____ same. Therefore, the removal procedure for one tie-down point
(2) only is given here.
(a)
Remove the nuts (4), and remove the screws (1) from the tie-down point (2).
(b)
Remove the tie-down point (2) from the structure (3).
(3) Remove the tie-down points (8): NOTE : The removal procedure for all the tie-down points (8) is the
____ same. Therefore, the removal procedure for one tie-down point
(8) only is given here.
(a)
Remove the nuts (10), and remove the screws (7) from the tie-down point (8).
(b)
Remove the tie-down point (8) from the plug housing (9).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备4(45)