(2)
Replace the related escape-slide enclosure (Ref. TASK 25-62-47-000-001) (Ref. TASK 25-62-47-400-001).
(3)
Make an entry in the logbook to record the reactivation.
ESCAPE FACILITIES - CABIN - ADJUSTMENT/TEST
___________________________________________
TASK 25-62-00-710-001
Operational Test of the Escape-Slide Deployment, FWD/AFT Passenger/Crew Door
1. Reason for the Job
__________________
Refer to the MPD TASK: 256241-04
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific plastic sheet No specific safety barriers No specific video cameras (optional) No specific 1 ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE No specific 1 STOPWATCH No specific 3 WARNING NOTICE 98D52103500000 2 SAFETY PIN - SLIDE ARMING
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-069 TACKY TAPE (Ref. 20-31-00) Material No. 05-109 D DAN 493 LAMINATE, A/C INTERIOR (Ref. 20-31-00)
EFF : ALL
25-62-00Page 501
May 01/04
R
CES C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power R 25-62-44-400-001 Installation of the Escape-Slide Pack-Assembly R 25-62-44-860-001 Removal of the Inflated Escape-Slide
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
52-10-00-610-001 Replacement of the Diaphragm in the Percussion
Mechanism of the Door Damper and Emergency Operation Cylinder of the Passenger/Crew Doors 52-10-00-614-001 Discharging/Charging of the Damper and Emergency Operation Cylinder of the Passenger/Crew Doors 52-10-00-860-002 Special Precautions after Work on the Passenger/Crew Door 25-62-00-991-010 Fig. 501
3. Job Set-up
__________
Subtask 25-62-00-860-056
A. Aircraft Maintenance Configuration
(Ref. Fig. 501/TASK 25-62-00-991-010)
NOTE : We recommend that you do the operational test in a maintenance
____
hanger.
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2)
Make sure that the emergency control-handle (3) is set to the DISARMED/MANUAL position, with the SAFETY PIN - SLIDE ARMING (98D52103500000) (2) installed.
(3)
Open the applicable passenger/crew door (referred to as door) (Ref. TASK 52-10-00-010-001) from the passenger compartment.
(4)
Fuselage protection procedure:
CAUTION : MAKE SURE THAT THE PROTECTION IS IN POSITION ON THE
_______ FUSELAGE BELOW THE DOOR SILL. DEPLOYMENT OF THE ESCAPE-SLIDE CAN CAUSE DAMAGE TO THIS AREA.
EFF : ALL
25-62-00Page 502
R Escape-Slide Deployment - Preparation Figure 501/TASK 25-62-00-991-010
EFF : ALL 25-62-00 Page 503 Aug 01/03
CES
(a)
Do not use bubble wrap as protection for the aircraft fuselage. NOTE : The protection is a laminate of fiberglass-reinforced
____ polyester SPECIAL MATERIALS (Material No. 05-109), which has a minimum thickness of 1.2 mm (0.06 in.). It is thin, impact resistant and applies the load equally to prevent damage to the fuselage.
(b)
Put an ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position to help you attach the protection.
(c)
Attach the protection in position: CAUTION : MAKE SURE THAT THE PROTECTION IS CORRECLTY ATTACHED
_______
(d)
If you do a deployment test on the right AFT door, make sure that you do not attach the protection on the outflow valve.
WITH TAPE TO THE AIRCRAFT STRUCTURE.
THIS PREVENTS THE SUCTION OF LOOSE MATERIAL INTO THE
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备4(70)